Inspections for the day of: Friday, July 14, 2000.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01174 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMAPASS
tim ###-#### L/C isued. #16687 7/18/00 1:31:57 PM
BLD00-01775 BLD-Framing/Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPART
neil ###-#### steel stud framing Int office walls ok (only) 7/18/00 1:28:41 PM
BLD00-01287 BLD-Framing/Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPART
reinspection bryan ###-#### Ok to insul...keep C/N, recall w/new Mez. check. 7/18/00 1:28:27 PM
BLD99-03630 BLD-Framing/Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPART
jerry ###-#### fr insp Upper layer @ tunnel corridio. South end of to continue, keep C/N's. 7/18/00 1:29:54 PM
BLD00-00925 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMAFAIL
###-#### Went by , unable to contact 3:30 pm. Left card. 7/18/00 1:30:18 PM
MEC00-02100 Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/13/2000 at 16:06:21. Contact: ###-####.
MEC00-02100 Pressure Test7/13/20007/14/20007/14/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/13/2000 at 16:06:36. Contact: ###-####.
BLD00-01388 BLD-Framing/Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/13/2000 at 16:37:37. Contact: ###-####. Ok to side- seal draft stops 7/18/00 1:28:01 PM
BLD00-00775 BLD-Footing7/14/20007/14/20007/14/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/14/2000 at 05:27:58. Contact: ###-####. C/N: soils report & "ok to pour" by engr. 7/18/00 1:31:46 PM
BLD98-01756 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/14/2000 at 07:03:35. Contact: ###-####. Keep C/N- east & south 1hr. walls ok to rock. 7/18/00 1:29:12 PM
MEC00-02100 Pressure Test7/14/20007/14/20007/14/2000 12:00:00 AMANR
To 350
BLD98-02283 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMPPART
W/owner: re changes to framing- add post or repair notch @ beam. WIP.
BLD00-01554 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMPFAIL
A & H supply; c/N firestops wall const.
BLD99-02085 BLD-Conference7/14/20007/14/20007/14/2000 12:00:00 AMPPASS
W/architect re: 1hr. req's keep C/N
BLD00-00104 BLD-Other7/14/20007/14/20007/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/14/2000 at 10:31:29. Contact: ###-####. NEED HTG FINALLED, COMPLETE PRIOR C/N. SPOKE W/ OWNER
BLD00-01177 BLD-Energy code compliance7/14/20007/14/20007/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/14/2000 at 10:51:21. Contact: .C/N, NEED ADDL WATTSUN OR MECCHECK & TRUSS CLIPS
BLD00-01177 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMPPART
LESLEY ###-####--RE-INSP FR
BLD00-01315 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMPFAIL
###-####--for homeowner --nueriv fn
called, no response, left msg, recall when ready