BLD00-01174
| BLD-Final | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PASS |
|
|
tim ###-#### L/C isued. #16687 7/18/00 1:31:57 PM
|
BLD00-01775
| BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PART |
|
|
neil ###-#### steel stud framing Int office walls ok (only) 7/18/00 1:28:41 PM
|
BLD00-01287
| BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PART |
|
|
reinspection bryan ###-#### Ok to insul...keep C/N, recall w/new Mez. check. 7/18/00 1:28:27 PM
|
BLD99-03630
| BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PART |
|
|
jerry ###-#### fr insp Upper layer @ tunnel corridio. South end of to continue, keep C/N's. 7/18/00 1:29:54 PM
|
BLD00-00925
| BLD-Final | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Went by , unable to contact 3:30 pm. Left card. 7/18/00 1:30:18 PM
|
MEC00-02100
| Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 16:06:21. Contact: ###-####.
|
MEC00-02100
| Pressure Test | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 16:06:36. Contact: ###-####.
|
BLD00-01388
| BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 16:37:37. Contact: ###-####. Ok to side- seal draft stops 7/18/00 1:28:01 PM
|
BLD00-00775
| BLD-Footing | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 05:27:58. Contact: ###-####. C/N: soils report & "ok to pour" by engr. 7/18/00 1:31:46 PM
|
BLD98-01756
| BLD-Framing/Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 07:03:35. Contact: ###-####. Keep C/N- east & south 1hr. walls ok to rock. 7/18/00 1:29:12 PM
|
MEC00-02100
| Pressure Test | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | A | NR |
|
|
To 350
|
BLD98-02283
| BLD-Framing/Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | PART |
|
|
W/owner: re changes to framing- add post or repair notch @ beam. WIP.
|
BLD00-01554
| BLD-Framing/Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | FAIL |
|
|
A & H supply; c/N firestops wall const.
|
BLD99-02085
| BLD-Conference | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | PASS |
|
|
W/architect re: 1hr. req's keep C/N
|
BLD00-00104
| BLD-Other | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 10:31:29. Contact: ###-####. NEED HTG FINALLED, COMPLETE PRIOR C/N. SPOKE W/ OWNER
|
BLD00-01177
| BLD-Energy code compliance | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 10:51:21. Contact: .C/N, NEED ADDL WATTSUN OR MECCHECK & TRUSS CLIPS
|
BLD00-01177
| BLD-Framing/Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | PART |
|
|
LESLEY ###-####--RE-INSP FR
|
BLD00-01315
| BLD-Final | 7/13/2000 | 7/14/2000 | 7/14/2000 12:00:00 AM | P | FAIL |
|
|
###-####--for homeowner --nueriv fn
called, no response, left msg, recall when ready
|