Inspections for the day of: Friday, July 14, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-02332 Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAFAIL
###-####
MEC00-02321 Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPASS
jerry ###-#### r/i-re-insp
BLD00-01906 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMAPASS
linda gibbs ###-####-she has the hard card
BLD99-03332 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/13/2000 at 14:32:59. Contact: .
MEC00-02360 Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/13/2000 at 14:36:09. Contact: ###-####.
BLD00-01110 BLD-Framing/Rough-in7/13/20007/14/20007/14/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/13/2000 at 15:43:30. Contact: . Added inside shear, no detail found. 7/14/00 2:46:35 PM
BLD00-01376 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMAFAIL
jay ###-#### fn C/N smoke detector. 7/14/00 2:46:43 PM
BLD00-01704 BLD-Foundation7/13/20007/14/20007/14/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/13/2000 at 16:50:41. Contact: ###-####.
BLD00-00509 BLD-Final7/13/20007/14/20007/14/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/13/2000 at 22:39:28. Contact: ###-####.
BLD00-01601 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/14/2000 at 09:30:49. Contact: ###-####. C/N posted 7/18/00 1:25:50 PM
BLD00-01413 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMPNR
Terry, ###-#### - late afternoon No approved plans 7/18/00 1:26:05 PM
BLD00-01058 BLD-Framing/Rough-in7/14/20007/14/20007/14/2000 12:00:00 AMPFAIL
SHEAR WALL--###-####-ROSS C/N posted 7/18/00 1:26:14 PM