Inspections for the day of: Monday, July 14, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00299 INSP-Sprinkler Rough-in/Hydro7/10/20037/14/20037/14/2003 8:55:11 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Paul Highley Inspection cancelled from web by: Paul Highley
BLD03-00812 FIRE-Final Inspection7/11/20037/14/20037/14/2003 12:00:00 AMAPASS
Cathy has the card, pls call if approved
BLD03-00906 FIRE-Final Inspection7/11/20037/14/20037/14/2003 12:00:00 AMAPASS
jack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIR03-00313 INSP-Final Inspection7/11/20037/14/20037/14/2003 12:00:00 AMAPASS
###-#### jack
FIR03-00345 INSP-Alarm Testing7/11/20037/14/20037/14/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/11/2003 at 3:27:43 PM. Contact: ###-####.
BLD02-02459 FIRE-Final Inspection7/14/20037/14/20037/14/2003 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 7/14/2003 at 8:57:04 AM. Contact: ###-####. rescheduled for 7/15 7/14/2003 3:24:42 PM
MIS03-00134 FIR-Final7/14/20037/14/20037/14/2003 12:00:00 AMPPASS
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MIS03-00135 FIR-Final7/14/20037/14/20037/14/2003 12:00:00 AMPPASS
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIR03-00296 INSP-Sprinkler Rough-in/Hydro7/14/20037/14/20037/14/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 7/14/2003 at 9:54:18 AM. Contact: ###-####. Ahrens is okay to cover; still need to strap down two heads in hallway; lobby completed; this permit covers the entire floor 7/14/2003 2:51:40 PM
BLD03-00757 FIRE-Final Inspection7/14/20037/14/20037/14/2003 12:00:00 AMPPASS
dave; Phone #: ###-#### Internet Inspection Request from: Darla Downs