FIR04-00227
| FIR-Aging Inspection | 7/14/2004 | 7/14/2004 | 7/14/2004 12:00:00 AM | | NR |
|
|
Per the fire sprinkler contractor the work is done and an inspection will be called in. 7/14/2004 1:31:47 PM
|
FIR04-00402
| INSP-Final Inspection | 7/13/2004 | 7/14/2004 | 7/14/2004 12:00:00 AM | A | FAIL |
|
|
Can't give final since no ceiling tile has been installed and one existing hanger ring needs to be re-attached to the building structure. See approved plans for location. 7/14/2004 9:56:38 AM
|
FIR04-00304
| INSP-Final Inspection | 7/13/2004 | 7/14/2004 | 7/14/2004 12:00:00 AM | A | FAIL |
|
|
Provide knox key box per review note #7. Provide signage per review note#8. Provide complete map for the facp. Repair the exterior access doors to the fire alarm panel room 7/14/2004 10:01:51 AM
|
BLD03-01726
| FIRE-Final Inspection | 7/14/2004 | 7/14/2004 | 7/14/2004 12:00:00 AM | P | FAIL |
|
|
Provide building address and suite numbers. Provide door hardware for compliance verification. Provide "Door to remain unlocked..." sticker on the tenant exit. Provide approved door hardware on the rear doors. Key locking as provided is not allowed. Provide a fire extinguisher per review notes. Provide panic hardware on the main exit. Install and test exit sign. 7/14/2004 4:04:31 PM
|