Inspections for the day of: Thursday, July 14, 2005.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-02417 Sprinkler (Final)7/14/20057/14/20057/14/2005 1:37:58 PMPPASS
anthony ###-#### sp final ok
PLM05-01203 Final7/13/20057/14/20057/14/2005 11:17:45 AMAFAIL
please call 30 min prior//nick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa water heater t&p drain needs an air gap. pipe R.P. discharge in piping that will take the full flow, to the mop sink or outside. or change out to a DCVA and test.
PLM05-02410 Sprinkler (Final)7/13/20057/14/20057/14/2005 10:31:10 AMAPASS
robert ###-#### pressure irr. r.p. final ok
PLM05-02406 Water and/or Sewer7/13/20057/14/20057/14/2005 10:00:33 AMAPASS
###-#### excavation inc sw frinal ok
PLM05-02405 Water and/or Sewer7/13/20057/14/20057/14/2005 9:59:57 AMAPASS
excavation inc; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa sw final ok
PLM05-01810 Final7/13/20057/14/20057/14/2005 9:33:20 AMAFAIL
Scheduled by a contractor via Hello! on 7/13/2005 at 5:10:16 PM. Contact: ###-####. turn on water and calk
PLM05-01807 Final7/13/20057/14/20057/14/2005 9:09:41 AMAPASS
Scheduled by a contractor via Hello! on 7/13/2005 at 5:07:52 PM. Contact: ###-####. final ok
PLM05-02409 Water and/or Sewer7/13/20057/14/20057/14/2005 8:44:04 AMAPASS
###-#### michelle sw final ok
PLM05-01405 Final7/14/20057/14/20057/14/2005 12:00:00 AMAPASS
sw finaled 5/6
PLM05-02405 Final7/14/20057/14/20057/14/2005 12:00:00 AMPPASS
excavation inc; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa sw final ok
PLM05-02406 Final7/14/20057/14/20057/14/2005 12:00:00 AMPPASS
###-#### excavation inc sw final ok
PLM05-02409 Final7/14/20057/14/20057/14/2005 12:00:00 AMPPASS
###-#### michelle sw final ok