BLD05-00521
| BLD-Conference | 7/11/2005 | 7/12/2005 | | A | |
|
|
per Dixie's request////for questions please call her at ###-####
|
MEC05-02148
| Pressure Test | 7/14/2005 | 7/14/2005 | 7/14/2005 3:51:38 PM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Angie Thome
|
MEC05-02156
| Rough-in | 7/14/2005 | 7/14/2005 | 7/14/2005 3:43:55 PM | P | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
MEC05-02011
| Rough-in | 7/14/2005 | 7/14/2005 | 7/14/2005 3:42:20 PM | P | PASS |
|
|
Jason Chandler is the installer. Call him if you have any questions.; Phone #: ###-#### Internet Inspection Request from: Monica Henderson
|
MEC05-02059
| Pressure Test | 7/13/2005 | 7/14/2005 | 7/14/2005 2:19:02 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC05-02059
| Rough-in | 7/13/2005 | 7/14/2005 | 7/14/2005 2:15:01 PM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS...elec box in r/a plenum main floor..wire in r/a downstairs..shield b-vent attic..oh oh
|
MEC05-00958
| Final | 7/14/2005 | 7/14/2005 | 7/14/2005 1:31:50 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/14/2005 at 7:53:27 AM.
|
MEC04-01669
| Pressure Test | 7/13/2005 | 7/14/2005 | 7/14/2005 11:55:06 AM | A | PASS |
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
MEC05-01952
| Rough-in | 7/13/2005 | 7/14/2005 | 7/14/2005 10:48:13 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 11:38:30 AM. Contact: ###-####....ok to cover walls and ceiling in basement and 1st floor...fire dampers all in place
|
MEC05-02155
| Final | 7/12/2005 | 7/14/2005 | 7/14/2005 9:46:32 AM | A | PASS |
|
|
a/c only, please call Lynn if you have any problems, ###-####; Phone #: ###-#### Internet Inspection Request from: Stephanie Smith
|
MEC05-02173
| Pressure Test | 7/13/2005 | 7/14/2005 | 7/14/2005 9:45:35 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 2:10:09 PM. Contact: ###-####.
|
MEC05-02173
| Rough-in | 7/13/2005 | 7/14/2005 | 7/14/2005 9:44:27 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 2:11:02 PM. Contact: ###-####...remove straps from gas tite between studs and install striker plates..install stand-offs on f/p and provide clearances..strap r/a duct in upstairs bathroom, it is cutting off air supply
|