FIR06-00134
| INSP-Conference | 7/14/2006 | 7/14/2006 | 7/14/2006 4:04:56 PM | P | DONE |
|
|
I spoke to Terry with Crane alarm about phone line concerns stemming from information I received from another contractor.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 7/14/2006 | 7/14/2006 | 7/14/2006 4:03:55 PM | P | PASS |
|
|
The piping above the hardlids as marked on the 2nd and 3rd floor plans is ok to cover.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 7/13/2006 | 7/14/2006 | 7/14/2006 3:21:19 PM | P | PASS |
|
|
The two heads and associated piping located in the first floor elevator lobby are ok to cover.
|
FIR06-00303
| INSP-Sprinkler Rough-in | 7/13/2006 | 7/14/2006 | 7/14/2006 3:15:11 PM | A | PART |
|
|
Underground sprinkler supply line as shown on the plans is 6". As installed piping is 4". I have allowed the piping to be buried under the condition that Bill Alexander is contacted and the overhead plans are modified to show this change.
|
FIR06-00219
| FIR-Aging Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 2:59:15 PM | | NR |
|
|
work is in progress
|
FIR05-00620
| INSP-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 2:57:52 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 7:48:57 AM. Contact: ###-####.
|
FIR05-00659
| INSP-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 2:57:28 PM | P | FAIL |
|
|
Forward flush of both backflow preventors passed. Still need to get letter stating it is ok to hang 6" main from a single truss
|
FIR05-00644
| INSP-Sprinkler Rough-in | 7/13/2006 | 7/14/2006 | 7/14/2006 1:04:12 PM | A | PASS |
|
|
North half of the first floor piping is ok to cover
|
BLD05-02650
| FIRE-Final Inspection | 7/13/2006 | 7/14/2006 | 7/14/2006 11:03:04 AM | A | PASS |
|
|
Life safety finaled
|
MIS06-00158
| FIR-Final | 7/13/2006 | 7/14/2006 | 7/14/2006 10:47:23 AM | A | PASS |
|
|
Life safety passed. Temporary address numbers are being used until sign is installed.
|
BLD06-00277
| FIRE-Final Inspection | 7/12/2006 | 7/14/2006 | 7/14/2006 10:26:43 AM | A | PASS |
|
|
Life safety finaled. The two doors that access the exterior patio are still a issue. George Slane is researching the issue still. Per George I'm to let the structural inspector address the issue, with George's decision at the building final.
|
FIR06-00198
| INSP-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 10:24:36 AM | P | PASS |
|
|
Fire sprinkler permit finaled
|
BLD06-01117
| FIRE-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 9:40:09 AM | A | PASS |
|
|
Life safety finaled.
|
BLD05-00775
| FIRE-Final Inspection | 7/13/2006 | 7/14/2006 | 7/14/2006 9:39:40 AM | A | FAIL |
|
|
The only life safety items looked at were the exit signs, emergency lights and the exit discharge lights. An exit discharge light is required at the main entry/exit. The overhead sprinkler system needs finaled as well as the fire alarm.
|
FIR05-00883
| INSP-Sprinkler Rough-in/Hydro | 7/13/2006 | 7/14/2006 | 7/14/2006 9:37:43 AM | A | FAIL |
|
|
Arrived at job site to witness the underground hydro test but they were not ready.
|