Inspections for the day of: Monday, July 14, 2008.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-01144 ELE-Aging Inspection7/14/20087/14/20087/17/2008 4:05:59 PM FAIL
no work done
ELE08-01811 Electrical Rough-In7/14/20087/14/20087/15/2008 9:09:27 AMPPASS
This is for Floor Heat inspection. Could we please have this 1st thing after lunch today if possible? Internet Inspection Request from: John Edwards no esc
ELE08-01915 Electrical Rough-In7/14/20087/14/20087/15/2008 9:08:14 AMPPASS
this is ready, please call the electrician at ###-#### 20 min before to meet you. Phone #: ###-#### Internet Inspection Request from: gary batten no esc
ELE08-01915 DOC - Permit Finaled7/14/20087/14/20087/14/2008 4:07:07 PMPPASS
ESC08-00595 Random Inspection7/14/20087/14/20087/14/2008 3:39:29 PMPPASS
looked ok
ELE08-01931 Electrical Rough-In7/14/20087/14/20087/14/2008 3:39:03 PMPPART
paul Note: undergound pipe conduit Phone #: ###-####
ESC08-00373 Random Inspection7/14/20087/14/20087/14/2008 3:37:48 PMPPASS
looks good
ELE08-00531 Permanent Service7/14/20087/14/20087/14/2008 3:37:19 PMPNR
Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA
address is for another building
remove bonding jumper from meter pack and seal unused openings and external ground wire that does not run with feeder conductors.
ELE08-01890 Rough-In Permanent Service7/14/20087/14/20087/14/2008 2:54:30 PMPFAIL
Scheduled by a contractor via Hello! on 7/14/2008 at 7:48:30 AM. Contact: ###-####.
box overfilled at bottom of stairs.
Approved plans do not show range and microwave hood downstairs. It is shown as a wet bar not a kitchen.
ELE08-01046 Final7/14/20087/14/20087/14/2008 1:50:28 PMPPART
steve Phone #: ###-####
signed T/O
cords not permited unless terninate in canope or cord and plug connected receps flush with covers and raised floor room not yet inspected.
ELE07-03352 Final7/14/20087/14/20087/14/2008 1:50:17 PMPPART
steve Phone #: ###-####
signed T/O
cords not permited unless terninate in canope or cord and plug connected receps flush with covers and lock out for heater
ESC07-00611 Random Inspection7/14/20087/14/20087/14/2008 1:45:50 PMPPASS
looks ok
ELE08-01494 Electrical Rough-In7/14/20087/14/20087/14/2008 11:44:48 AMAPART
Scheduled by a contractor via Hello! on 7/14/2008 at 6:16:35 AM. Contact: ###-####.
underground ok
ELE08-01626 Conference7/11/20087/14/20087/14/2008 10:49:31 AMAPART
Mike- call before going Phone #: ###-####
talked about the service change.
ELE08-01915 Electrical Rough-In7/14/20087/14/20087/14/2008 10:46:49 AMPCANC
this is ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten Inspection cancelled from web by: gary batten
ELE08-01297 Final7/13/20087/14/20087/14/2008 9:36:46 AMANR
need ok to cover trench between unattached garage and house. Not ready for final Phone #: ###-#### Internet Inspection Request from: Daryl DeGrange
ELE08-01297 Electrical Rough-In7/14/20087/14/20087/14/2008 9:36:37 AMPPASS
need ok to cover trench between unattached garage and house. Not ready for final Phone #: ###-#### Internet Inspection Request from: Daryl DeGrange
undreground ok
ESC07-01477 Random Inspection7/14/20087/14/20087/14/2008 9:35:45 AMAPART
trash container over filled.
called and rob who said it would be cleaned up today
ESC08-00424 Site Preparation7/14/20087/14/20087/14/2008 8:37:39 AMAPASS
sign posted and trash is contained
ELE08-01923 Electrical Rough-In7/11/20087/14/20087/14/2008 8:36:51 AMAPASS
Kyle Phone #: ###-####
service still needs guy kit and access for electrode connection.
R/I Ok