Inspections for the day of: Monday, July 14, 2008.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00116 Aging Inspection7/14/20087/14/20087/15/2008 3:25:33 PM PASS
ESC06-00114 Aging Inspection7/14/20087/14/20087/15/2008 3:12:03 PM PASS
ESC08-00486 Site Preparation7/11/20087/14/20087/14/2008 3:37:08 PMAPASS
Sign posted.
CAS
ESC07-01478 BMP Violation7/10/20087/14/20087/14/2008 3:08:06 PMPFAIL
Sign not posted at site. Need to clean up all hard surfaces better, free them of sediment.
Smash the the wattle joints together better or overlap. Cannot have gaps between pieces. Spoke with RP and will re-inspect on 7/18/08
CAS
ESC07-01472 General Inspection7/11/20087/14/20087/14/2008 3:01:07 PMAFAIL
Spoke with Project manager (Chris Mason) sincethe RP is on vacation.
Need to clean up gutterpan off all sediment and debris.
Protech 1 d.i. at the south west end of project. Will re-inspect on 7/18/08
CAS
ESC08-00505 General Inspection7/10/20087/14/20087/14/2008 11:40:28 AMAFAIL
Slope has not been stabilized. Will be occuring sometime this week. Will re-inspect on 7/18/08.
CAS
ESC08-00467 General Inspection7/11/20087/14/20087/14/2008 11:30:22 AMACANC
Sign posted and started to re-install straw blanket. Needs more pins to hold the blanket better to the slope. Left message with RP regarding the proper instalation requirements.
CAS
ESC08-00155 Tracking Control7/11/20087/14/20087/14/2008 11:01:09 AMAPASS
All issues dealt with pertaining with notice.
CAS
ESC08-00170 Tracking Control7/11/20087/14/20087/14/2008 10:30:50 AMAPASS
Gutterpan cleaned up.
CAS
ESC08-00282 General Inspection7/14/20087/14/20087/14/2008 10:10:32 AMAPART
Need to clean up hard surface of sediment.
Not worried over the stock pile of gravel in parking lot.
CAS
ESC08-00513 Site Preparation7/14/20087/14/20087/14/2008 9:27:50 AMAPASS
perimeter bmp's installed and sign posted at front of project.
CAS
ESC08-00066 Tracking Control7/14/20087/14/20087/14/2008 8:51:39 AMAFAIL
Need to re-install your construction entrance at the west of project area. Clean up any sediment on hard surface.
CAS
ESC08-00069 Tracking Control7/14/20087/14/20087/14/2008 8:51:00 AMAFAIL
Need to re-install your construction entrance at the west of project area. Clean up any sediment on hard surface.
CAS
ESC07-01522 Random Inspection7/14/20087/14/20087/14/2008 8:47:37 AMAPART
protect perimeter or remove stock pile away from curb.
CAS
460
ESC08-00593 Site Preparation7/11/20087/14/20087/14/2008 8:37:28 AMANR
Worh has not started on the pool yet. Will re-inspect a week from now.
CAS