Inspections for the day of: Tuesday, July 14, 2009.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00255 INSP-Sprinkler Rough-in/Hydro7/14/20097/14/20097/15/2009 12:52:57 PMPFAIL
above ground hydro failed. No rough in inspection was performed
FIR09-00056 FIR-Aging Inspection7/14/20097/14/20097/15/2009 12:24:08 PM NR
wip
FIR09-00033 INSP-Sprinkler Rough-in/Hydro7/10/20097/14/20097/15/2009 8:15:01 AMAPASS
Rough-in complete on systems #7 and #8. Tim Frost verified that the 4x4 structural members will be considered obstructions and will need to be addressed on all systems. Also the ducting/roof penatrations will require sprinkler protection below them. This was addressed with Jeff with treasure valley fire.
BLD09-00427 FIRE-Final Inspection7/13/20097/14/20097/15/2009 7:19:04 AMPFAIL
Life safety will be ok to final when the project related fire alarm and fire sprinkler drawings have been modified to exclude sutie 325
FIR09-00396 INSP-Final Inspection7/13/20097/14/20097/14/2009 3:33:05 PMAFAIL
Piping is ok to cover. Can not give a final until the ceiling tile is installed.
FIR08-00830 INSP-Sprinkler Rough-in/Hydro7/14/20097/14/20097/14/2009 3:32:16 PMPPASS
The area under the stairs at the mechanical room/riser room can be covered.
BLD07-01910 FIRE-Final Inspection7/13/20097/14/20097/14/2009 2:27:08 PMAFAIL
The items needing correctlng for a life safety final include repairing all of the first floor exit signs and emergency lights as circled in red on the city approved plans. None of the second floor exit signs or emergency lights have been tested. All other life safety items are passed.
BLD09-00899 FIRE-Final Inspection7/13/20097/14/20097/14/2009 2:02:29 PMAPART
A temporary occupancy was given until the thumbturn is removed and lever hardware is provided on north warehouse exit door. Also I could not reach the sales area exit sign and emergency light test switches to see if they worked. They will need to be tested when I come back for the door hardware as per discussion with contractor.
BLD09-00537 FIRE-Final Inspection7/14/20097/14/20097/14/2009 1:31:24 PMPFAIL
Life safety in areas B and D is ok when the project related fire alarm for these areas is complete.
FIR09-00316 INSP-Alarm Testing7/13/20097/14/20097/14/2009 1:30:23 PMAFAIL
Todays inspection was for areas B and D. Alarms will be complete in these two areas when Alarmco finals their AES system and the samples tubes are installed correctly in the existing duct smoke detectors or verification is provided that this was an exceptable installation at the time the building was built.
BLD09-00274 FIRE-Final Inspection7/14/20097/14/20097/14/2009 1:10:31 PMPPASS
Life safety passed. Contractor to provide ADA approved single action hardware on the new office door as discussed.
BLD09-01105 FIRE-Final Inspection7/14/20097/14/20097/14/2009 12:45:17 PMPPASS
Life safety passed. The owner to install the address as discussed prior to the building inspection.
BLD09-00703 FIRE-Final Inspection7/13/20097/14/20097/14/2009 12:09:45 PMAPASS
life safety passed per stephanie cobbley
BLD09-00601 FIRE-Final Inspection7/13/20097/14/20097/14/2009 10:44:58 AMAPASS
James Phone #: ###-#### This permit has been passed previously by forrest france.
BLD06-01450 FIRE-Final Inspection7/13/20097/14/20097/14/2009 10:20:03 AMAPASS
Life safety passed.
FIR08-00438 INSP-Final Inspection7/13/20097/14/20097/14/2009 10:18:50 AMAPASS
Pemit finaled as per TIm Frost
FIR08-00439 INSP-Final Inspection7/13/20097/14/20097/14/2009 10:18:25 AMAPASS
Pemit finaled as per TIm Frost
FIR05-00698 INSP-Alarm Testing7/13/20097/14/20097/14/2009 10:17:36 AMAPASS
permit finaled
FIR05-00698 INSP-Final Inspection7/14/20097/14/20097/14/2009 10:16:54 AMPPASS
permit finaled
FIR09-00345 INSP-Final Inspection7/13/20097/14/20097/14/2009 8:36:10 AMAFAIL
The scope of work should actually state work in suites 315 and 325. As per telephone discussions between myself, Tim and Eddy with Western States plans need to be resubmitted deleting suite 325 from the scope of work since this area is going to be on hold. All work in suite 315 is complete and the permit can be finaled when the revised scope of work is issued.