Inspections for the day of: Tuesday, July 14, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00388 Site Preparation7/14/20097/14/20097/15/2009 8:19:10 AM PASS
ESC09-00387 Site Preparation7/14/20097/14/20097/14/2009 1:46:02 PM CANC
Completed by inspector #316
ESC09-00187 Site Preparation7/14/20097/14/20097/14/2009 1:32:24 PM NR
Work has not begun. Waiting on a start date.
ESC09-00186 Site Preparation7/14/20097/14/20097/14/2009 1:32:11 PM NR
Work has not begun. Waiting on a start date.
ESC09-00184 Site Preparation7/14/20097/14/20097/14/2009 1:32:02 PM NR
Work has not begun. Waiting on a start date.
ESC09-00182 Site Preparation7/14/20097/14/20097/14/2009 1:31:54 PM NR
Work has not begun. Waiting on a start date.
ESC09-00181 Site Preparation7/14/20097/14/20097/14/2009 1:31:42 PM NR
Work has not begun. Waiting on a start date.
ESC09-00294 Conference7/13/20097/14/20097/14/2009 11:19:48 AMADONE
WEnt over with Rp that prior to pour date that a concrete washout pit is required with signage posted.
ESC09-00420 Site Preparation7/14/20097/14/20097/14/2009 11:14:46 AM FAIL
Verbal to RP:
Post ESC sign visable from the street.
Protect storm drain within the back school playground.
Will re-inspect on 7/20/09 AM.
ESC07-01172 Site Final7/14/20097/14/20097/14/2009 10:31:53 AMPFAIL
Spoke with RP:
Remove all tempoary BMP's and site can be finaled. Will wait on a phone call to do the the finalizing of the permit if it meets the requirements.
ESC09-00379 Site Preparation7/10/20097/14/20097/14/2009 10:28:24 AMAPART
Discussec with the project over the provisions required such as a washout and storm drain inlet protection. Also told the project that once all soil has been excavated and spread out on the field to the west that is needs to be temporarly stabilized with a tachifier or permanitely stabilize with a seed mix and watered freaquently to promote germination of the seed.
ESC09-00352 Conference7/7/20097/14/20097/14/2009 10:25:30 AMADONE
Went over info of the close out of the phase of work of the utilities and rough cut of roads.
ESC09-00352 General Inspection7/7/20097/14/20097/14/2009 10:24:38 AMAPASS
Site is in good condition. All area of ground disturbing activites are not close to the boise river at this time. Excavating out one of the ponds and have an into gound water. Will be pumping out of the pond and using the water for dust control. Will re-inspect on 7/20/09AM