Inspections for the day of: Wednesday, July 14, 2010.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00473 BMP Violation7/14/20107/14/20107/14/2010 3:37:58 PMPCANC
wrong date
ESC08-00026 Aging Inspection7/14/20107/14/20107/14/2010 3:26:29 PM PART
In the process of trying to achieve final stabilization.
ESC10-00186 General Inspection ESC7/14/20107/14/20107/14/2010 3:25:41 PM PART
Will be inspecting 14 days for status of activity on the project. NO activity is not present as of today.
ESC09-00602 Site Preparation7/13/20107/14/20107/14/2010 3:23:14 PMAPASS
ESC09-00601 Site Preparation7/13/20107/14/20107/14/2010 3:22:55 PMAPASS
ESC09-00220 General Inspection7/14/20107/14/20107/14/2010 2:14:43 PM DONE
ESC09-00220 DOC - Permit Expired7/14/20107/14/20107/14/2010 2:14:25 PMPPASS
ESC10-00496 Site Preparation7/14/20107/14/20107/14/2010 2:07:49 PM PART
Excavating work will occur next week. Will re-inspect on 7/21/10.
ESC10-00524 Site Preparation7/14/20107/14/20107/14/2010 1:27:32 PM NR
ESC10-00443 BMP Violation7/14/20107/14/20107/14/2010 11:17:55 AMAPART
Message to RP:
Must post an ESC sign at each phase location.
Must provide a site preparation prior to stat of any additional phases for BMP compliance.
ESC10-00525 Site Preparation7/14/20107/14/20107/14/2010 10:54:53 AM PASS
ESC10-00437 Site Preparation7/14/20107/14/20107/14/2010 9:07:10 AM NR
ESC10-00473 Site Preparation7/14/20107/14/20107/14/2010 8:26:19 AM FAIL
Verbal to RP:
1. Provide a non storm water pollutant washout.
2. Provide a storm drain inlet protection at the storm drain at the west end of the project.
3. Post ESC sign at the front of the building.
Will re-inspect on 7/16/10am.