ESC11-00347
| Site Preparation | 7/14/2011 | 7/14/2011 | 7/15/2011 8:01:27 AM | P | PART |
|
|
daily maintanence on the BMPs,, as well as clean up
|
BLD11-01242
| BLD-Foundation | 7/14/2011 | 7/14/2011 | 7/15/2011 8:00:26 AM | P | PART |
|
|
Mana Phone #: ###-####,, some rebar is tied for the stem walls,, work in progress,, (note... some of the footings were dug down below the surface,, most are 10-12" thick)
|
BLD11-01085
| BLD-Foundation | 7/12/2011 | 7/14/2011 | 7/15/2011 7:56:23 AM | P | PART |
|
|
--Robert Phone #: ###-####,, basement walls work in progress
|
BLD11-01242
| BLD-Foundation | 7/14/2011 | 7/14/2011 | 7/15/2011 7:55:48 AM | P | NR |
|
|
mana Phone #: ###-####
|
BLD11-01206
| BLD-Framing/Rough-in | 7/14/2011 | 7/14/2011 | 7/14/2011 6:33:29 PM | P | NR |
|
|
mana Phone #: ###-####
|
BLD11-01634
| BLD-Footing | 7/13/2011 | 7/14/2011 | 7/14/2011 3:49:55 PM | P | PASS |
|
|
dan Phone #: ###-####
|
ESC11-00326
| General Inspection | 7/12/2011 | 7/14/2011 | 7/14/2011 3:35:47 PM | A | PART |
|
|
with 460,, conf. on BMPs,, daily clean up,, need to maintain barriers
|
BLD11-01206
| BLD-Framing/Rough-in | 7/13/2011 | 7/14/2011 | 7/14/2011 1:12:19 PM | A | PASS |
|
|
Marvin-Please call at least 30 mins prior to inspection Phone #: ###-####
|
BLD11-01620
| BLD-Footing | 7/13/2011 | 7/14/2011 | 7/14/2011 12:28:46 PM | A | PASS |
|
|
paul Phone #: ###-####
|
BLD11-01242
| BLD-Foundation | 7/13/2011 | 7/14/2011 | 7/14/2011 12:28:22 PM | A | NR |
|
|
Mana Phone #: ###-####
|
BLD11-00897
| BLD-Framing/Rough-in | 7/13/2011 | 7/14/2011 | 7/14/2011 11:35:49 AM | A | PASS |
|
|
CHRIS Phone #: ###-####,, ok to insulate,, will have some double shear
|
BLD11-01399
| BLD-Footing | 7/13/2011 | 7/14/2011 | 7/14/2011 12:00:00 AM | P | CANC |
|
|
eric Phone #: ###-#### - around 3 if possible pleaseContractor called and canceled
|