BLD16-00812
| FIRE-Final Inspection | 7/13/2016 | 7/14/2016 | 7/14/2016 1:03:12 PM | P | CANC |
|
|
Not ready. Rescheduled for tomorrow morning
|
BLD16-01648
| FIRE-Final Inspection | 7/13/2016 | 7/14/2016 | 7/14/2016 10:39:50 AM | A | FAIL |
|
|
Need city approved plans and small documents.
|
BLD16-01040
| FIRE-Conference | 7/13/2016 | 7/14/2016 | 7/13/2016 2:55:12 PM | A | DONE |
|
|
Todays inspection was just for the stub out from the building. Top of pipe measured 4'-2" to the top of the footing. Per the job superintendant and the underground installer an additional 12" of dirt is to be installed on top of the pipe. This will give the required 4'-6" of cover.
|