Inspections for the day of: Tuesday, July 14, 2020.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-00427 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:48:28 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-00426 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:48:12 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-00425 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:48:01 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-00424 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:47:50 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-00423 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:47:39 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-00422 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:47:29 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-00371 BLD-Wall Bracing7/14/20207/14/20207/14/2020 4:47:29 PMPNR
Shear .... SCREENED // Kenny Phone #: 208- ###-####
BLD20-01994 BLD-Final7/14/20207/14/20207/14/2020 3:41:10 PMPDONE
Pls contact Eric @ ###-#### or Bryce @ ###-#### if you have any questions. Thanks in advance. Inspection requested via web by Rob Maes
BLD20-01994 DOC - Permit Finaled7/14/20207/14/20207/14/2020 3:41:01 PMPPASS
Per the scope of work and engineers letter, no new work was required to upgrade existing roof structure. Appears that all clearances maintained.
BLD20-01439 BLD-Framing/Rough-in7/13/20207/14/20207/14/2020 3:39:51 PMPFAIL
Phone #: ###-#### Inspection requested via web by Rob Johnson. Roll block 2nd. floor joist at glue lam beam in garage. strap 4x8 header in hall at stair side and roll blocl floor joist at 4x8 header. Complete fire blocking around flex duct work at 2nd floor ceiling adjacent to tube above stairs. Complete foam seal around oval duct 2nd. floor.. C/N posted. Ok to insulate.
BLD20-01272 BLD-Framing/Rough-in7/13/20207/14/20207/14/2020 3:36:37 PMPFAIL
Phone #: ###-#### Inspection requested via web by Rob Johnson. complete lateral bracing on B01, B02, B03 and B04 trusses. Reinstall lateral bracing on A03 trusses were removed. Provide full height roll blocking on A03 and A04 trusses at raised heals. C/N posted. Ok to insulate.
BLD19-02261 BLD-Final7/14/20207/14/20207/14/2020 1:45:55 PMPDONE
William - Does not need to go inside the house */Screened*/ Phone #: ###-####
BLD19-02261 DOC - Permit Finaled7/14/20207/14/20207/14/2020 1:45:47 PMPPASS
BLD19-01790 BLD-Final7/13/20207/14/20207/14/2020 1:02:41 PMADONE
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne Robinson
BLD19-01790 BLD-Conference7/13/20207/14/20207/14/2020 1:02:41 PMACANC
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne Robinson
BLD19-01790 DOC - Permit Finaled7/14/20207/14/20207/14/2020 1:02:41 PMPPASS
BLD20-02186 BLD-Final7/13/20207/14/20207/14/2020 11:26:13 AMADONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-02186 DOC - Permit Finaled7/14/20207/14/20207/14/2020 11:26:05 AMPPASS
All work appearted to be done in accordance with local codes and ordinaces.
BLD20-01620 BLD-Framing/Rough-in7/13/20207/14/20207/14/2020 10:55:35 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Rob Johnson Inspection cancelled from web by: Rob Johnson
BLD20-01275 BLD-Framing/Rough-in7/13/20207/14/20207/14/2020 10:55:11 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Rob Johnson Inspection cancelled from web by: Rob Johnson
BLD19-01068 BLD-Final7/13/20207/14/20207/14/2020 9:41:09 AMAPASS
SCREENED // Cecil Phone #: ###-####. . Ok for perm occ.
BLD20-01045 BLD-Footing7/13/20207/14/20207/14/2020 8:55:39 AMAPASS
Sharon - */Screened*/ Phone #: ###-####. Column pad footings at front entry.
BLD20-00673 BLD-Framing/Rough-in7/13/20207/14/20207/14/2020 8:27:40 AMAPEND
screened - bolt // Shane Phone #: ###-####. Bolts are in snug tight condition, all plys are in conact. 3rd part inspection required to complete turn of the nut method per plans.