BLD01-02720
| BLD-Conference | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | | NR |
|
|
PLEASE CALL FOR PERMIT EXTENSION ###-#### PETER called, left msg 7/15/2002 5:01:47 PM
|
BLD02-00505
| BLD-Framing/Rough-in | 7/12/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | A | FAIL |
|
|
FR INSP- MIKE ###-#### c/n onsite, reca 7/15/2002 12:13:43 PM ll 7/15/2002 12:15:34 PM
|
BLD02-00259
| BLD-Framing/Rough-in | 7/12/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | A | PART |
|
|
TIM- ###-####- WALL COVER; c/n...fireproofing, patch lid membrane... walls ok except as noted7/15/2002 4:53:10 PM 7/15/2002 4:55:45 PM
|
BLD02-01528
| BLD-Conference | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | A | PART |
|
|
re stair rules, headroom
|
MEC02-00986
| Conference | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | A | FAIL |
|
|
called bldr, has c/n from frame, wrote add'l c/n...permit for 1 f.p....2 installed, no manuals onsite
|
MEC02-01609
| Final | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | P | FAIL |
|
|
no access to equipment, duct, and gasline. all covered by insulation. 7/15/2002 3:51:04 PM
|
BLD00-03176
| BLD-Conference | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | P | PASS |
|
|
NEEDS PERMIT EXTENSION ###-#### MIKE; work still in progess; ok. 7/15/2002 5:08:10 PM
|
BLD02-01200
| BLD-Framing/Rough-in | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | P | PART |
|
|
Don, ###-####...part, add kickers at TOW as shown, chk at final...ok to cover walls 7/15/2002 3:37:03 PM
|
MEC02-00986
| Final | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 09:17:12. Contact: ###-####...keep c/n 7/15/2002 1:37:29 PM
|
MEC02-01609
| Conference | 7/15/2002 | 7/15/2002 | 7/15/2002 12:00:00 AM | P | PART |
|
|
w/ Alan H...re r/i, need 350's ok.
|