MIS03-00133
| FIR-Final | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | A | PASS |
|
|
kimberly ###-####
|
BLD02-02661
| FIRE-Final Inspection | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 4:02:05 PM. Contact: ###-####. this was previously signed by Troy on 6/27/03 as the fire sprinkler and alarm permits are completed 7/15/2003 9:57:16 AM
|
MIS03-00133
| FIR-Final | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | A | PASS |
|
|
|
FIR02-00459
| INSP-Sprinkler Rough-in/Hydro | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | A | PART |
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hydro okay on both systems; need to tag system; tape/paper on some heads and escutcheons 7/15/2003 5:05:43 PM
|
FIR03-00320
| INSP-Final Inspection | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 3:22:36 PM. Contact: ###-####.
|
BLD02-02459
| FIRE-Final Inspection | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | P | PASS |
|
|
some firestopping needed on second floor electrical room (comm cables) and will be completed for strcutural inspector 7/15/2003 1:32:17 PM
|
FIR03-00299
| INSP-Sprinkler Rough-in/Hydro | 7/14/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Paul Highley will be rescheduled 7/15/2003 5:06:21 PM
|
FIR03-00360
| INSP-Final Inspection | 7/15/2003 | 7/15/2003 | 7/15/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 9:11:24 AM. Contact: ###-####.
|