BLD04-00891
| FIRE-Final Inspection | 7/12/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 7/15/2004 8:45:35 AM
|
FIR04-00341
| INSP-Final Inspection | 7/13/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | A | CANC |
|
|
Per contractor to be rescheduled for tomorrow 7/15/2004 8:58:26 AM
|
FIR04-00353
| INSP-Final Inspection | 7/13/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | A | PASS |
|
|
Permit finaled 7/15/2004 8:59:23 AM
|
FIR03-00779
| INSP-Sprinkler Rough-in/Hydro | 7/14/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | A | PART |
|
|
Hydro tests for both dry systems are ok. 24 hour test on the second dry system started at 12:45 at 67psi 7/15/2004 12:44:05 PM
|
BLD04-01019
| FIRE-Alarm Testing | 7/15/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | P | PASS |
|
|
fire alarm portion of the correction list has been corrected 7/15/2004 3:59:33 PM
|
FIR04-00300
| INSP-Sprinkler Rough-in | 7/15/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | P | PASS |
|
|
Sprinkler piping above the hard lid areas are ok for cover. I also looked at the main and branchline sizing, hangers and earthquake bracing. They are ok as well. Sprig ups, drops and return bends have not been inspected since not all work is complete. 7/15/2004 2:33:21 PM
|
FIR04-00404
| INSP-Sprinkler Rough-in | 7/15/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | P | FAIL |
|
|
Provide hanger on the horizontal piping that is currently laying on a piece of unattached uni-strut 7/15/2004 2:34:56 PM
|
FIR04-00404
| INSP-Final Inspection | 7/15/2004 | 7/15/2004 | 7/15/2004 12:00:00 AM | P | FAIL |
|
|
Rough-in failed 7/15/2004 2:35:53 PM
|