Inspections for the day of: Friday, July 15, 2005.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00124 BLD-Framing/Rough-in7/15/20057/15/20057/15/2005 3:56:46 PMPNR
Scheduled by a contractor via Hello! on 7/15/2005 at 7:54:06 AM. Contact: ###-####.
needs seal pack 1st
BLD05-01642 BLD-Conference7/14/20057/15/20057/15/2005 3:55:54 PMPPART
Scheduled by a contractor via Hello! on 7/14/2005 at 10:37:20 PM. Contact: ###-####.
general ?s
BLD03-01203 BLD-Conference7/15/20057/15/20057/15/2005 2:48:08 PMPPASS
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
BLD04-02481 BLD-Final7/15/20057/15/20057/15/2005 2:46:53 PMPNR
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need trades 1st,,, also need handrails to return,,, no formal inspection made
BLD05-01100 BLD-Framing/Rough-in7/14/20057/15/20057/15/2005 12:32:38 PMAPART
Scheduled by a contractor via Hello! on 7/14/2005 at 2:43:24 PM. Contact: ###-####.
okj to insulate,, need fireblocks,, b vent seperation,, seal holes,, etc.
BLD05-01712 BLD-Footing7/14/20057/15/20057/15/2005 10:28:26 AMAPART
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD04-02741 BLD-Final7/14/20057/15/20057/15/2005 9:44:50 AMAFAIL
Rob###-####
c/n posted,,, need handrails in garage
BLD05-01321 BLD-Final7/14/20057/15/20057/15/2005 9:43:30 AMAPASS
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-01145 BLD-Footing7/14/20057/15/20057/15/2005 9:36:50 AMAPART
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
shop ftgs
BLD05-01321 DOC - Permit Finaled7/15/20057/15/20057/15/2005 12:00:00 AMPPASS
BLD03-01203 DOC - Permit Finaled7/15/20057/15/20057/15/2005 12:00:00 AMPPASS
should have been doc finaled