Inspections for the day of: Tuesday, July 15, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-00850 DOC - Permit Finaled7/15/20087/15/20087/15/2008 3:57:25 PMPPASS
ESC08-00588 Site Preparation7/15/20087/15/20087/15/2008 2:15:51 PMPNR
no work done yet
ELE08-01947 Electrical Rough-In7/15/20087/15/20087/15/2008 1:46:39 PMPPASS
Contact: Chris Carmine - inspection to cover Phone #: ###-#### Internet Inspection Request from: Deb Gooden
no esc
ELE08-01937 Electrical Rough-In7/15/20087/15/20087/15/2008 1:16:10 PMPPASS
Contact: Chris Carmine - ispection to cover please Phone #: ###-#### Internet Inspection Request from: Deb Gooden
walls ok
ELE08-01798 Electrical Rough-In7/15/20087/15/20087/15/2008 12:58:07 PMPPASS
Approval to cover grid cieling Phone #: ###-#### Internet Inspection Request from: Alan Lusk
no esc
ELE08-01940 Conference7/14/20087/15/20087/15/2008 12:03:22 PMACANC
Please contact me at least one hour prior to your availability. Thank you, Dan Wright
###-#### Internet Inspection Request from: Dan Wright
talked about violations retained and abandoned low voltage wires
ELE08-01917 Electrical Rough-In7/14/20087/15/20087/15/2008 11:39:38 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA
386.60 Grounding
Surface metal raceway enclosures providing a transition from other wiring methods shall have a means for connecting an equipment grounding conductor.
386.100 Construction
Surface metal raceways and their elbows, couplings, and similar fittings shall be designed so that the sections can be electrically and mechanically coupled together and installed without subjecting the wires to abrasion.
250.148 Continuity and Attachment of Equipment Grounding Conductors to Boxes.
(A) Metal Boxes. A connection shall be made between the one or more equipment grounding conductors and a metal box
314.16 Number of Conductors in Outlet, Device, and Junction Boxes, and Conduit Bodies.
Boxes and conduit bodies shall be of sufficient size to provide free space for all enclosed conductors.
6 #14 max in 1 7/8” deep handi box.
210.52 Dwelling Unit Receptacle Outlets.
(A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(3). Within 6 ft. of door openings.
ESC08-00339 Random Inspection7/15/20087/15/20087/15/2008 11:39:03 AMAPASS
looked ok
ELE08-01631 Final7/14/20087/15/20087/15/2008 10:27:50 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Spencer Mclean
no esc
ESC08-00588 Site Preparation7/15/20087/15/20087/15/2008 9:52:36 AMANR
nothing done yet
ELE08-01932 Temporary Service7/14/20087/15/20087/15/2008 9:52:10 AMAFAIL
Jesse Phone #: ###-####
requires 8 ft clearance over flat garage roof
ELE08-01867 Electrical Rough-In7/14/20087/15/20087/15/2008 9:10:15 AMAPASS
this is ready, please call electrician at ###-#### 20 min before to meet you Phone #: ###-#### Internet Inspection Request from: gary battenno esc
ELE08-01867 DOC - Permit Finaled7/15/20087/15/20087/15/2008 9:09:59 AMPPASS
ELE08-01937 Electrical Rough-In7/14/20087/15/20087/15/2008 9:07:12 AMANR
Contact: Chris Carmine Suite #301 rough in please Phone #: ###-#### Internet Inspection Request from: Deb Gooden
this is a common wall with suite #300 and has sheetrock on that side and requires securing of cable for that side prior to cover. please call both permits for cover when ready.
no esc