FIR08-00462 INSP-Sprinkler Rough-in7/15/20087/15/20087/16/2008 4:57:09 PMPPART
OH fire sprinkler work is approved for cover at the drop ceilings, QR heads installed, noted one leaking drop to be repaired-marked location with GC on site.
BLD07-02653 FIRE-Final Inspection7/14/20087/15/20087/15/2008 4:31:18 PMAFAIL
Egress lights did not function, fire lanes were not marked.KR
FIR07-00606 INSP-Sprinkler Rough-in/Hydro7/14/20087/15/20087/15/2008 4:22:08 PMPDEFR
Rescheduled per contractor request.
FIR08-00018 INSP-Sprinkler Rough-in7/14/20087/15/20087/15/2008 4:09:34 PMAPART
Re-inspection completed for the 5th floor correction notice, okayed install pending as-builts for minor field modifications.
FIR08-00318 INSP-Final Inspection7/15/20087/15/20087/15/2008 3:47:23 PMPPASS
Fire alarm testing completed.KR
FIR08-00284 INSP-Final Inspection7/15/20087/15/20087/15/2008 3:46:39 PMPPASS
Fire alarm testing completed. KR
BLD08-01503 FIRE-Final Inspection7/14/20087/15/20087/15/2008 1:34:02 PMAPASS
Life safety passed.Thumb turn on rear exit will be removed and door latch for restroom will be changed to correct hardware and will be re-inspected by the structual inspector.Notified Jim Storey about these corrections to be verified. KR
FIR08-00484 INSP-Final Inspection7/14/20087/15/20087/15/2008 11:58:47 AMAPART
Work appears satisfactory, however the sprinkler plans and permit card could not be located on site for verification of compliance as required.
BLD08-00658 FIRE-Final Inspection7/14/20087/15/20087/15/2008 11:56:31 AMAFAIL
Need project related fire alarm work requested for field inspection/approval prior to building life safety final, all items on C/N must be completed.
BLD07-01884 FIRE-Final Inspection7/15/20087/15/20087/15/2008 11:33:23 AMPPASS
All corrections were made per notes from last inspection. KR
BLD08-00843 FIRE-Final Inspection7/15/20087/15/20087/15/2008 11:31:52 AMPPASS
All corrections were made per Forrest notes from last inspection.KR
FIR07-00935 INSP-Final Inspection7/14/20087/15/20087/15/2008 11:23:59 AMAPASS
Chain and lock was added to PIV. New set of resubmitted plans were on site with all corrections made. KR
FIR07-00812 INSP-Final Inspection7/15/20087/15/20087/15/2008 11:20:25 AMPPASS
Underground permit finaled.KR
FIR07-00902 INSP-Alarm Testing7/14/20087/15/20087/15/2008 10:19:38 AMACANC
Wrong inspection request type-"alarm testing" to be completed in conjunction with the project related FIR permit called in for afternoon inspection.
BLD07-03260 FIRE-Alarm Testing7/14/20087/15/20087/15/2008 10:04:38 AMACANC
Duplicate inspection request-"alarm testing" is covered under project related FIR permits.
BLD07-01248 FIRE-Alarm Testing7/14/20087/15/20087/15/2008 10:03:39 AMACANC