FIR10-00054
| INSP-Sprinkler Rough-in | 7/15/2010 | 7/15/2010 | 7/15/2010 2:15:37 PM | P | PART |
|
|
Okayed overhead modification at the janitors room and the preaction system tie-in above the sheetrock lid.
|
FIR09-00449
| INSP-Final Inspection | 7/15/2010 | 7/15/2010 | 7/15/2010 2:13:58 PM | P | PASS |
|
|
Acceptance testing and final inspections passed. Permit final approved.
|
FIR09-00536
| INSP-Final Inspection | 7/13/2010 | 7/15/2010 | 7/15/2010 2:12:59 PM | A | PASS |
|
|
Final acceptance testing and inspection passed. See also project related FIR09-00449 for activity notes regarding this permit. Fire sprinkler permit finaled.
|
FIR10-00295
| INSP-Sprinkler Rough-in | 7/14/2010 | 7/15/2010 | 7/15/2010 10:20:24 AM | A | PART |
|
|
Overhead rough-in at the main lobby 100 as per red lined area marked and initialed with today's date is approved for cover. Noted one pendent head at the rolled ceiling in close proximity to a junction box which may present an obstruction depending on type of light fixture installed.
|
BLD10-01549
| FIRE-Final Inspection | 7/14/2010 | 7/15/2010 | 7/15/2010 9:51:09 AM | A | PASS |
|
|
Life safety inspection passed.
|