FIR10-00256
| INSP-Sprinkler Rough-in | 7/14/2010 | 7/15/2010 | 7/15/2010 3:47:27 PM | A | PASS |
|
|
The 2" underground supply piping is ok to cover.
|
FIR10-00288
| INSP-Final Inspection | 7/15/2010 | 7/15/2010 | 7/15/2010 3:40:29 PM | P | PASS |
|
|
Permit finaled. A supervisory point has been added.
|
FIR10-00332
| INSP-Final Inspection | 7/15/2010 | 7/15/2010 | 7/15/2010 2:46:31 PM | P | PASS |
|
|
Permit finaled
|
BLD10-00780
| FIRE-Final Inspection | 7/15/2010 | 7/15/2010 | 7/15/2010 2:46:03 PM | P | FAIL |
|
|
The project related fire alarm and FM200 permits need to finaled prior to performing the life safety inspection.
|
FIR10-00246
| INSP-Final Inspection | 7/15/2010 | 7/15/2010 | 7/15/2010 2:42:53 PM | P | PASS |
|
|
permit finaled
|
BLD10-01381
| FIRE-Final Inspection | 7/12/2010 | 7/15/2010 | 7/15/2010 10:29:48 AM | A | FAIL |
|
|
Remove the thumbturn lock on the door between the office and workout area, remove the thumbturn and provide single action lever hardware on the rear exit door or romove the round knob hardware and provide ADA compliant dead bolt as discussed.
|
BLD10-01047
| FIRE-Final Inspection | 7/14/2010 | 7/15/2010 | 7/15/2010 8:45:25 AM | A | FAIL |
|
|
The lever hardware on the office and restroom doors does not override the lock, the new storefront door out the north side of the tenant has not been installed. There is an exit sign/emergency light above the location now. I told Cal and his son that the door/hardware needs to be installed per plan or a plan modification with Tim Woodard will be needed showing the door removed from the plans.
|