ESC13-00014
| General Inspection | 7/9/2013 | 7/9/2013 | | | |
|
|
|
BLD12-02258
| BLD-Final | 7/12/2013 | 7/15/2013 | 7/16/2013 10:16:34 AM | A | PASS |
|
|
dave Phone #: ###-#### OK for Perm Occ.
|
BLD13-01558
| BLD-Foundation | 7/15/2013 | 7/15/2013 | 7/15/2013 4:18:33 PM | P | CANC |
|
|
steve Phone #: ###-####
|
BLD13-01230
| BLD-Foundation | 7/15/2013 | 7/15/2013 | 7/15/2013 4:17:19 PM | P | PASS |
|
|
Navaro Phone #: ###-####
|
GCB13-00067
| GCB-Final | 7/12/2013 | 7/15/2013 | 7/15/2013 4:16:13 PM | P | PART |
|
|
Todd ###-#### Called in final.........should have been a framing inspection. Framing inspection Pass.
|
GCB13-00045
| GCB-Framing | 7/15/2013 | 7/15/2013 | 7/15/2013 4:13:41 PM | P | NR |
|
|
Braydon ###-####
|
GCB13-00043
| GCB-Framing | 7/15/2013 | 7/15/2013 | 7/15/2013 4:12:40 PM | P | NR |
|
|
Braydon ###-####3
|
GCB13-00044
| GCB-Framing | 7/15/2013 | 7/15/2013 | 7/15/2013 4:11:45 PM | P | NR |
|
|
Braydon ###-####
|
MIS13-00203
| BLD-Conference | 7/12/2013 | 7/15/2013 | 7/15/2013 12:16:30 PM | A | DONE |
|
|
call for lock box code//Ron Garvin Phone #: ###-####
|
BLD13-01866
| BLD-Conference | 7/15/2013 | 7/15/2013 | 7/15/2013 12:15:42 PM | A | PASS |
|
|
The roof is ready for final inspection.
Thank you Phone #: ###-#### >> Inspection requested via web by Michael La Pointe
|
BLD13-01866
| DOC - Permit Finaled | 7/15/2013 | 7/15/2013 | 7/15/2013 12:15:24 PM | P | PASS |
|
|
|
BLD13-01422
| BLD-Footing | 7/12/2013 | 7/15/2013 | 7/15/2013 11:55:41 AM | A | PASS |
|
|
Mike Phone #: ###-####
|
GCB13-00018
| GCB-Final | 7/12/2013 | 7/15/2013 | 7/15/2013 10:29:12 AM | A | PASS |
|
|
John ###-#### Unable to determine if all other required agencies have finaled. Structural final only.....OK.
|