Inspections for the day of: Monday, July 15, 2013.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00037 INSP-Sprinkler Rough-in7/12/20137/15/20137/15/2013 3:56:20 PMPPASS
Rough to cover passed for areas marked ok on the second floor.
BLD12-00452 FIRE-Final Inspection7/15/20137/15/20137/15/2013 3:20:15 PMPFAIL
Provide racking permit for racks exceeding 8' in height as per note #11 of the fire review and repair the exit sign/emergency light at the south exit
BLD12-02063 BLD-Final7/15/20137/15/20137/15/2013 2:30:04 PMPPASS
Fire life safety passed
BLD12-03273 FIRE-Final Inspection7/12/20137/15/20137/15/2013 2:28:47 PMPCANC
Cancel per Joe Phone #: ###-#### To be rescheduled for tomorrow morning.
FIR13-00175 INSP-Sprinkler Rough-in/Hydro7/12/20137/15/20137/15/2013 2:25:41 PMPCANC
Rescheduled for tomorrow morning.
FIR13-00148 INSP-Final Inspection7/12/20137/15/20137/15/2013 2:02:00 PMPCANC
We would like to schedule this with alarm testing and fire life safety final. Please call with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
FIR13-00116 INSP-Sprinkler Rough-in7/15/20137/15/20137/15/2013 1:31:18 PMPPASS
24 air test on dry system started at 1:30 with 45psi on the guage
FIR13-00214 INSP-Sprinkler Rough-in7/15/20137/15/20137/15/2013 1:09:10 PMPPASS
Todays inspection was a rough-in for the whole system. See locations circled in red where the sprinkler protection at the unit heaters has not been installed. Per Tim the EFSR heads located under/in the smoke vents are ok more than 18" from the deck. Per the drawings no earth quake bracing/retaining straps are required and none are installed. I did not look at the riser. The overhead hydro test of the dry system passed. A plan modifiction is required for the piping changes in the north office area and the heads under the overhead doors.
BLD13-00925 FIRE-Final Inspection7/15/20137/15/20137/15/2013 10:36:18 AMPFAIL
Provide fire extinguishers as discussed for both tenant spaces including the second floor areas. Provide doors that swing out, have approved hardware and have an exit sign per the approved plans from the Breakroom or get new approvals from plan review.
FIR13-00294 INSP-Final Inspection7/12/20137/15/20137/15/2013 10:27:42 AMACANC
Cancel per Alex Phone #: ###-####
FIR13-00255 INSP-Final Inspection7/12/20137/15/20137/15/2013 8:09:04 AMAFAIL
Todays inspection was just a final for the "dry storage" area. Sprinklers are complete in this area but other areas are still under construction.