Inspections for the day of: Tuesday, July 15, 2014.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01156 General Inspection7/15/20147/15/20147/15/2014 4:07:59 PM PASS
Finaled.
ESC13-01156 DOC - Permit Finaled7/15/20147/15/20147/15/2014 4:07:43 PMPPASS
Statue is installed and surrounding area stabilized. ESC conditions satisfied.
ESC14-00215 General Inspection7/15/20147/15/20147/15/2014 3:58:48 PM PASS
Work confined within vegetative barrier of yard. No corrections needed.
ESC13-00909 General Inspection7/15/20147/15/20147/15/2014 3:38:36 PM PASS
WIP. Scraping existing parking lot asphault and hauling away. No trackout or discharges observed.
ESC14-00175 Site Preparation7/15/20147/15/20147/15/2014 3:27:16 PMPPASS
Marcus # 484- 0028

Met Marcus on site and reviewed ESC site plan. All DI's have protection, permit is posted. Will use EcoPan wash out service for concrete.
It should be noted there is extensive roadwork and stormwater utility work on Roosevelt Street occuring at same time.

Approved for construction.
ESC14-00144 Random Inspection7/15/20147/15/20147/15/2014 12:12:21 PMPPASS
Underground utilities have been installed, roads paved, and curbing installed. No dust issues, trackout, or illicit discharges observed at time of inspection.
ESC13-00975 General Inspection7/15/20147/15/20147/15/2014 12:03:02 PM PASS
WIP progress. Should be done within a month. No corrections at this time. No violations observed.
ESC13-00199 Random Inspection7/15/20147/15/20147/15/2014 11:55:32 AMPPASS
Some survey work being conducted in Dallas Harris #11 for either more infrastructure or perhaps plotting the new parcels. No trackout or violations. Will continue to monitor activity.
ESC12-00539 General Inspection7/15/20147/15/20147/15/2014 11:53:14 AM PASS
Some of the area is being used for work related to Harris Rance #12 so will keep open at this time. Construction on phase 9-10 for site development is complete. No corrections at this time.
ESC14-00527 General Inspection7/15/20147/15/20147/15/2014 11:37:22 AMPPASS
WIP for pool and some related infrastructure for pool. Large stockpiles on site, but no sediment on street or sidewalk.
ESC13-00860 Aging Inspection7/15/20147/15/20147/15/2014 11:35:53 AM PASS
Finaled.
ESC13-00860 DOC - Permit Finaled7/15/20147/15/20147/15/2014 11:35:43 AMPPASS
Home construction is complete, BLD finaled, and occupied. Homeowner is now installing a pool and landscape features. This work is covered under a seperate BLD permit and ESC14-00527. ESC conditions satisfied for this permit.
ESC14-00175 Site Preparation7/14/20147/15/20147/15/2014 11:16:15 AMACANC
late am // Marcus Phone #: ###-####

Rescheduled for the afternoon in order to install BMPs.
ESC13-00754 Aging Inspection7/15/20147/15/20147/15/2014 9:05:13 AM PASS
Finaled.
ESC13-00754 DOC - Permit Finaled7/15/20147/15/20147/15/2014 9:05:03 AMPPASS
ESC conditions satisfied. Construction on townhome is complete.
ESC13-00753 Aging Inspection7/15/20147/15/20147/15/2014 9:04:51 AM PASS
Finaled.
ESC13-00753 DOC - Permit Finaled7/15/20147/15/20147/15/2014 9:04:36 AMPPASS
ESC conditions satisfied. Construction on townhome is complete.