Inspections for the day of: Wednesday, July 15, 2015.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS15-00178 FIR-Conference7/14/20157/15/20157/17/2015 9:35:51 AMADONE
I posted a stop work order on job site. I found demo work being done, removal of warehouse flooring and parking lot work to be done and the fire alarm panel has been relocated and disabled.
FIR15-00331 INSP-Alarm Testing7/14/20157/15/20157/15/2015 11:56:40 AMACANC
Duplicate inspection
FIR14-00752 INSP-Sprinkler Rough-in/Hydro7/14/20157/15/20157/15/2015 11:51:22 AMACANC
Tenting Phone #: ###-#### Inspection requested via web by Sam Ball
BLD15-00487 FIRE-Final Inspection7/14/20157/15/20157/15/2015 11:45:10 AMAPASS
Life safety passed
BLD15-01856 FIRE-Final Inspection7/14/20157/15/20157/15/2015 11:25:45 AMAPASS
Life Safety passed. Exit sign to be repaired prior to a building sign off.
FIR15-00478 INSP-Final Inspection7/14/20157/15/20157/15/2015 11:22:08 AMAPASS
Permit finaled
FIR15-00334 INSP-Alarm Testing7/14/20157/15/20157/15/2015 10:07:59 AMAPASS
24 hr air test Boise Spectrum - Bldg B
passed
BLD15-01638 FIRE-Final Inspection7/14/20157/15/20157/15/2015 10:06:29 AMAPASS
Life safety passed
FIR15-00442 INSP-Final Inspection7/14/20157/15/20157/15/2015 9:40:48 AMAPASS
Permit finaled
FIR15-00298 INSP-Final Inspection7/14/20157/15/20157/15/2015 8:53:14 AMAPASS
Permit finaled
FIR15-00481 INSP-Final Inspection7/14/20157/15/20157/15/2015 8:51:57 AMAPASS
Permit finaled
FIR14-00773 INSP-Sprinkler Rough-in7/14/20157/15/20157/15/2015 8:50:47 AMAPASS
Sprinkler rough-in and tenting passed. Piping can be covered.