BLD18-03767
| BLD-Concrete | 7/15/2020 | 7/15/2020 | 7/15/2020 4:55:54 PM | P | PASS |
|
|
screened // Keith Phone #: ###-####. Exterior slab on grade for main ramp from ground level to 1st. level elvated slab.
|
BLD20-01861
| BLD-Foundation | 7/15/2020 | 7/15/2020 | 7/15/2020 3:48:30 PM | P | PASS |
|
|
Ron *screened* Phone #: ###-####
|
BLD20-01334
| BLD-Foundation | 7/14/2020 | 7/15/2020 | 7/15/2020 2:59:18 PM | P | PART |
|
|
screened // Pat Phone #: ###-####
|
BLD20-02029
| BLD-Foundation | 7/15/2020 | 7/15/2020 | 7/15/2020 2:36:43 PM | P | PASS |
|
|
virtual inspection // Greg Phone #: ###-####
|
BLD20-01075
| BLD-Ceiling Grid Inspection | 7/14/2020 | 7/15/2020 | 7/15/2020 2:15:55 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by rick pew. A C/N notice was issued to draftstop concealed area bewtween hardlid and grid ceiling in areas not to exceed 3000 s.f. or provide sprinkler coverage.
|
BLD20-01318
| BLD-Wall Bracing | 7/15/2020 | 7/15/2020 | 7/15/2020 2:14:36 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD20-00308
| BLD-Framing/Rough-in | 7/14/2020 | 7/15/2020 | 7/15/2020 10:45:17 AM | A | PASS |
|
|
Andrew *screened** Phone #: ###-####
|
BLD19-02261
| BLD-Energy code compliance | 7/14/2020 | 7/15/2020 | 7/15/2020 9:55:58 AM | A | CANC |
|
|
Jaman - */Screnned*/ Phone #: ###-####
|
BLD18-01027
| BLD-Framing/Rough-in | 6/24/2020 | 7/15/2020 | 7/15/2020 9:55:46 AM | A | CANC |
|
|
|
BLD18-01027
| BLD-Conference | 7/15/2020 | 7/15/2020 | 7/15/2020 9:55:40 AM | A | DONE |
|
|
On site to meet new general contractor.
|
BLD20-01261
| BLD-Energy code compliance | 7/13/2020 | 7/15/2020 | 7/15/2020 8:42:18 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Rob Johnson
|
BLD20-01261
| BLD-Framing/Rough-in | 7/15/2020 | 7/15/2020 | 7/15/2020 8:42:05 AM | A | FAIL |
|
|
Still needs to fireblock concealed area adjacent to archway and justify no continous bearing under A08 truss.
|