BLD00-03456
| BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
see permit bld99-0444 for framing on schell it has been ok to insulate and framing has been approved. owner of building is working as time permits. 7/16/2001 9:57:53 AM
|
BLD00-03455
| BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
see permit bld99-0444 working slow but makeing progress. 7/16/2001 9:58:30 AM
|
BLD00-03353
| BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
this permit has expired but i have had contact with architect ,if nothing is done in 2 mo expire. 7/17/2001 11:56:06 AM
|
BLD01-00156
| BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
exp 7/25/01. 7/17/2001 11:52:16 AM
|
BLD01-01180
| BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
wip. 7/16/2001 9:52:52 AM
|
BLD01-00157
| BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
exp7/25/01. 7/17/2001 11:52:26 AM
|
MIS01-00018
| MIS-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
wip. 7/17/2001 11:51:12 AM
|
MIS01-00011
| MIS-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
exp 7/30/01. 7/17/2001 11:50:20 AM
|
MIS01-00085
| MIS-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | | PART |
|
|
wip. 7/17/2001 11:49:17 AM
|
BLD01-01032
| BLD-Framing/Rough-in | 7/13/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | A | PASS |
|
|
Shane ###-####conduit removed and replaced with steel,also walls ok. 7/16/2001 12:23:26 PM
|
MEC01-02053
| Pressure Test | 7/13/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/13/2001 at 13:32:51. Contact: ###-####. Line from meter to shop only. 7/16/2001 12:34:07 PM
|
BLD01-01594
| BLD-Final | 7/13/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | A | NH |
|
|
fn insp -steve-- ###-####. contractor wanted a reinspection of the truss girder nailing, still needs driveway for a final. The door to the shop is locked at this time. 7/16/2001 12:33:34 PM
|
BLD01-01699
| BLD-Foundation | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 07:44:04. Contact: ###-####.wip. 7/16/2001 3:54:42 PM
|
BLD01-00912
| BLD-Energy code compliance | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PASS |
|
|
Leroy Meyer ###-####
|
BLD01-01758
| BLD-Footing | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PART |
|
|
Elliott ###-####wip. 7/16/2001 4:06:14 PM
|
BLD01-01777
| BLD-Footing | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PART |
|
|
###-#### .poured no plans on site. 7/16/2001 3:55:03 PM
|
BLD01-00736
| BLD-Footing | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 10:06:27. Contact: .
|
BLD00-03691
| BLD-Energy code compliance | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 10:24:35. Contact: ###-####.2nd floor has c/n for walls. 7/16/2001 3:44:11 PM
|
BLD00-02949
| BLD-Energy code compliance | 7/16/2001 | 7/16/2001 | 7/16/2001 12:00:00 AM | P | PART |
|
|
Dan Short ###-####. need to have beam upper floor over window sized as per c/n also still need to work on wall at house side in basement for fire blocking. 7/16/2001 3:24:12 PM
|