Inspections for the day of: Monday, July 16, 2007.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-01360 Final7/16/20077/16/20077/16/2007 3:29:39 PMPNR
Thank you!! Phone #: ###-#### Internet Inspection Request from: Tracy Robertson
called not ready for final nothing trimed out
ELE07-02490 Electrical Rough-In7/16/20077/16/20077/16/2007 3:03:14 PMPPASS
paul Phone #: ###-#### r/i ok bedrm remodel, and new M bath
ELE07-02380 Electrical Rough-In7/16/20077/16/20077/16/2007 2:39:28 PMPFAIL
tom Phone #: ###-#### corr do not cover , called wire mesh shall be installed per instruction sheet for pool E grid potting ok
ELE07-02493 Rough-In Permanent Service7/16/20077/16/20077/16/2007 2:15:20 PMPPASS
chris Phone #: ###-#### r/i p/s u/g N ok
ELE07-02492 Temporary Service7/16/20077/16/20077/16/2007 1:01:09 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dan Rohl t/s u/g new ok
ELE07-02245 Electrical Rough-In7/12/20077/16/20077/16/2007 12:36:49 PMAPASS
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ok walls ahrd ceilings
ELE07-02147 Final7/13/20077/16/20077/16/2007 10:54:22 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Jari Rivers ok
ELE07-00791 Final7/13/20077/16/20077/16/2007 10:16:37 AMACANC
duane Phone #: ###-#### no power , power down
ELE07-02460 Temporary Service7/13/20077/16/20077/16/2007 9:59:16 AMANR
Contact: ###-####. 250.24 needs neutral brought to service, ser shall not be use in conduit, needs 100 amp
to job trailer per manufacture needs plastic conn. for GEC, needs manufacture listed neutral bus sevice disconnect
ELE07-01601 Final7/14/20077/16/20077/16/2007 9:10:24 AMAFAIL
Final inspection for inside, sign raceways exposed for inspector to see in flower bed Phone #: ###-#### Internet Inspection Request from: Monty Adkinson
corr fee due 210.8(B)(2) needs gfci for kit. 300.5 needs required depth for all conduits flower beb