FIR06-00495
| INSP-Final Inspection | 7/16/2007 | 7/16/2007 | 7/17/2007 12:31:15 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR07-00205
| INSP-Sprinkler Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 4:13:48 PM | A | PART |
|
|
See approved plan set for defficient areas.
|
FIR06-00959
| INSP-Sprinkler Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 4:11:38 PM | A | PART |
|
|
See areas approved for cover on the stamped plan set.
|
FIR07-00022
| INSP-Sprinkler Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 4:09:40 PM | A | PART |
|
|
Noted treated lumber is installed as bracing for ceiling fans above the sheetrock ceiling, requested letter from the electrical contractor stating all wood used for this purpose is fire treated, 3rd floor TI spaces are okay for cover at the hard lid ceilings.
|
FIR06-00888
| INSP-Alarm Testing | 7/16/2007 | 7/16/2007 | 7/16/2007 4:05:53 PM | A | NR |
|
|
Work is not yet completed for field inspection at this time.
|
FIR07-00285
| INSP-Supply line flush | 7/13/2007 | 7/16/2007 | 7/16/2007 4:04:30 PM | A | PART |
|
|
UG fire supply line flush completed satisfactory, circled on approved plans areas okay for cover on the 2nd floor, discussed coverage below stairs at the NW entry.
|