Inspections for the day of: Wednesday, July 16, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00902 INSP-Final Inspection7/16/20087/16/20087/16/2008 11:35:30 AMPFAIL
Surface mounted lights in both of the first floor and second floor janitor closets and the second floor elevator room are blocking the sprinkler pendants. Also the riser room is required to be one hour rated but has holes and a block out for a ceiling mounted access panel.
FIR08-00303 INSP-Final Inspection7/16/20087/16/20087/16/2008 10:56:27 AMPFAIL
Shell permit needs finaled first. This TI permit is ok to final when that happens.
FIR07-00894 INSP-Final Inspection7/16/20087/16/20087/16/2008 10:48:23 AMPPASS
Permit finaled
FIR08-00413 INSP-Sprinkler Rough-in/Hydro7/16/20087/16/20087/16/2008 10:48:02 AMPPASS
Hydro Inspection of the first floor and the remaining first floor sprinkler piping is ok to cover. The second floor needs to be completed.
FIR07-00902 INSP-Alarm Testing7/15/20087/16/20087/16/2008 10:45:44 AMACANC
Wrong inspection type called in.
FIR08-00455 INSP-Sprinkler Rough-in7/15/20087/16/20087/16/2008 10:43:07 AMAPASS
The large 13 head area is ok to cover. The other area per the sprinkler contractor is not going to be built. I requested as-built drawings from Jeff Anderson showing the change.
BLD07-01932 FIRE-Final Inspection7/16/20087/16/20087/16/2008 10:42:04 AMPPASS
Life safety passed
FIR08-00047 INSP-Final Inspection7/15/20087/16/20087/16/2008 10:04:13 AMAPASS
permit finaled