Inspections for the day of: Monday, July 16, 2012.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC12-01164 Final7/16/20127/16/20127/16/2012 4:49:42 PMPFAIL
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN..unable to find the air balance...called rob
MEC12-02362 Final7/16/20127/16/20127/16/2012 4:00:21 PMPNH
Please inspect around 2pm, thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas
MEC12-02342 Pressure Test7/16/20127/16/20127/16/2012 3:34:18 PMPFAIL
re-inspection- new gauge placed on. Held pressure for half n hour before leaving.
Phone #: ###-#### >> Inspection requested via web by Brian Preece...leak
MIS12-00196 MEC-Conference7/13/20127/16/20127/16/2012 2:49:52 PMAPEND
steven Phone #: 707-332- DARLA CALLED ME AS SHE NOTICED THERE WAS NO MECH PERMIT GROUPED TO THE BUILDING PERMIT..I LOCATED THE MECH PERMIT FOR THE HOODS UNDER THE PARCEL BUT IT WASN'T ATTACHED. I HAD DARLA PUT THE BUILDING PERMIT BACK TO THE ISSUE STAGE AS IT HAD BEEN FINALED. THE MECH PERMIT ONLY HAD ONE INSPECTION DONE BACK ON MAY 7TH WHICH LEFT SEVERAL REQUIRED INSPECTIONS NOT DONE. I THEN CALL BILL V. SO HE COULD CALL BOB A. TO RESOLVE THE PROBLEM. I HAD DARLA GROUP THE MECH PERMIT TO THE BUILDING PERMIT
MEC12-01555 Final7/16/20127/16/20127/16/2012 2:42:18 PMPPASS
oleg Phone #: ###-####
GCM12-00126 GCM-Rough In & Pressure Test7/16/20127/16/20127/16/2012 2:37:11 PMPPASS
Jerry @ ###-####....r/i ok...20lb gas ok...f/p...DUCT BLASTER TO BE DONE AT FINAL
MEC12-02209 Final7/16/20127/16/20127/16/2012 1:32:24 PMAPASS
meet home owner at 11:30
GCM12-00089 GCM-Final7/13/20127/16/20127/16/2012 11:32:27 AMAPASS
Jennifer @ ###-####
AM inspection requested
MEC12-02260 Final7/9/20127/16/20127/16/2012 11:08:20 AMAPASS
Homeowner, Emielle Cantrella, ###-####
Install owner supplied water heater. Phone #: ###-#### >> Inspection requested via web by Chris Field
MEC12-01950 Final7/12/20127/16/20127/16/2012 10:25:32 AMANH
Wilma ###-#### >> Inspection requested via web by MARGIE ROWE
MEC12-02325 Final7/13/20127/16/20127/16/2012 10:18:24 AMAPASS
Please call before arriving, thanks Phone #: ###-#### >> Inspection requested via web by Tom Soniville
MEC12-02209 Final7/10/20127/16/20127/16/2012 9:57:04 AMANH
OWNER, BRIAN MURPHY, ###-####
Installed owner supplied water heater. Phone #: ###-#### >> Inspection requested via web by Chris Field....left a message
MIS12-00193 MEC-Conference7/12/20127/16/20127/16/2012 9:53:11 AMAPART
per Dixie at 8:30 call Kevin w/Western Htg at ###-####....walking heating side of job with kevin..all ductwork to be replaced, equipment to big but all work was done by another company with-out a journeyman license or permit...western will take over the job and make all the corrections, pull a new permit and call for inspections. I called Daryl S. and told him the tankless w/h had corrections and sent him an inspection so he could call the plumbing contractor