FIR12-00253
| INSP-Final Inspection | 7/16/2012 | 7/16/2012 | 7/16/2012 3:53:33 PM | P | FAIL |
|
|
No inspection was performed due to no approved plans on site. Piping can not be covered.
|
BLD12-01006
| FIRE-Conference | 7/13/2012 | 7/16/2012 | 7/16/2012 3:02:04 PM | A | DONE |
|
|
Tenant space 206 and the main lobby up to the stairs is complete. Per the insulation contractor space 204 was done previously by an unknown contractor.
|
FIR12-00324
| INSP-Final Inspection | 7/16/2012 | 7/16/2012 | 7/16/2012 1:50:41 PM | P | PASS |
|
|
permit finaled
|
BLD12-01682
| FIRE-Final Inspection | 7/13/2012 | 7/16/2012 | 7/16/2012 1:08:02 PM | A | PASS |
|
|
life safety passed
|
FIR11-00496
| INSP-Sprinkler Rough-in | 7/16/2012 | 7/16/2012 | 7/16/2012 10:57:14 AM | P | PASS |
|
|
Forward flush passed.
|
FIR11-00442
| INSP-Final Inspection | 7/13/2012 | 7/16/2012 | 7/16/2012 10:55:59 AM | A | NR |
|
|
I tested all of the fire sprinkler device interconnections with the fire alarm system. I also verified most corrections previously noted by Forrest. The smoke detector for door release located on the first floor is still an issue.
|