Inspections for the day of: Monday, July 16, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00493 Site Preparation7/16/20127/16/20127/17/2012 3:35:21 PM PASS
ESC11-00525 BMP Violation7/13/20127/16/20127/17/2012 6:57:52 AMAFAIL
As Owyhee Construction tried to tap a 1" hole into the 16" water main, the water main split causing a high volume of turbid water from leaving the trenched area in the street and discharge off site into an area that could potentally be "wetlands". We notified Brown Construction sn the RP of the project to contact and notifiy all agencies, "(ACHD, DEQ, US ARMY CORPS and EPA of the discharge..

Since the activity for consrcution project was is ACHD right away and also permitted with ACHD, it is out of the juristiction of Boise City. Will follow up on 6/17/2012 AM for additional ereview of the project area.
ESC12-00334 BMP Violation7/16/20127/16/20127/16/2012 3:32:11 PMPFAIL
Verbal to RP:
Clean up the washed residual washed out on the project lot. Educate the sub contractors on the proper proceedures of washing out and washing of tools orther equipment that generate non storm water pollutants. Will re-inspect 7/17/2012 PM.
ESC11-00681 General Inspection7/16/20127/16/20127/16/2012 11:50:30 AM FAIL
Message to RP (David Bowman):
Provide a sediment barrier at the bottom of the proposed driveway until the time where the constrution of the access reaches partial stabilized with compacted pit run. Also next to the mail box, extend the silt fence to protect from any sediment disposition from occuring from the disturbed slope above. Will follow up on 7/18/2012
ESC11-00322 General Inspection7/16/20127/16/20127/16/2012 11:29:24 AM DONE
Permit finaled.
ESC11-00322 DOC - Permit Finaled7/16/20127/16/20127/16/2012 11:29:15 AMPPASS
ESC12-00677 Site Preparation7/13/20127/16/20127/16/2012 11:28:54 AMANR
Have begun to stage equipment.
ESC09-00599 General Inspection7/16/20127/16/20127/16/2012 11:28:22 AM PASS
ESC11-00593 Aging Inspection7/16/20127/16/20127/16/2012 11:28:07 AM PASS
ESC11-00522 General Inspection7/16/20127/16/20127/16/2012 11:27:50 AM PART
Verbal to RP:
(inspection was PART dueto the activities already being initiated.)
Verbal to RP:
Protect the stockpile along tthe back of sidewalk on Americana. Protect all storm drain inlets within the nterior of the newly paved area. Clean up the parking lot by the constrution trailer. Will re-inspect on 7/17/2012.
ESC10-00778 General Inspection7/16/20127/16/20127/16/2012 11:25:07 AM PASS
ESC12-00557 BMP Violation7/13/20127/16/20127/16/2012 8:50:48 AMAFAIL
Correction Notice:
Install a sediment barrier along back of curb to prevent sedimentfrom leaving the project area.
Failure to comply will result in further enforcement. Will re-inspect on 7/17/2012.