Inspections for the day of: Monday, July 16, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl Spivey
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM18-02894 Water and/or Sewer7/13/20187/16/20187/16/2018 2:21:14 PMPPASS
Call Mike White. we will have the back leg of the service trenched from the meter can to the golf course out house by Monday afternoon. call mike white at ###-#### or Gary tamez at ###-#### Phone #: ###-#### Inspection requested via web by Dawn Brubaker
PLM18-02894 DOC - Permit Finaled7/16/20187/16/20187/16/2018 2:20:33 PMPPASS
PLM18-02781 Plumbing Rough-in7/16/20187/16/20187/16/2018 1:55:21 PMPPASS
Phone #: ###-#### Inspection requested via web by Andrew Wilde
PLM18-02778 Plumbing Rough-in7/16/20187/16/20187/16/2018 1:50:53 PMPPASS
Phone #: ###-#### Inspection requested via web by Andrew Wilde
MIS18-00259 PLM-Conference7/16/20187/16/20187/16/2018 1:13:29 PMAPASS
put stop work on site until bld permit is obtained......plg permit issued and did walk thru with plumber.............ds
PLM17-03172 Plumbing Rough-in7/16/20187/16/20187/16/2018 11:24:22 AMAPART
Rough overhead drainage, south units Phone #: ###-#### Inspection requested via web by Preston Langdon
1st floor south overhead waste tested and gas to meter location tested at 60 lbs.......ds
PLM18-02971 Plumbing Rough-in7/13/20187/16/20187/16/2018 11:05:51 AMAPART
JUSTIN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
2nd floor restroom tested ok..........ds
PLM18-02931 Water Heater Final7/13/20187/16/20187/16/2018 10:32:11 AMAPASS
Please give the homeowner Ted a call when you are on your way. ###-####.
Thank You! Phone #: ###-#### Inspection requested via web by Ben Davis
PLM18-02956 Other7/13/20187/16/20187/16/2018 10:17:35 AMAPASS
Consultation Meeting Phone #: ###-#### Inspection requested via web by PATTY KIRK
put stop work on site until bld permit is obtained.....called front desk to set up MIS........ds
PLM18-02888 Other7/13/20187/16/20187/16/2018 10:04:06 AMAPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige
meeting on water sizing and building sewer line outside for grade......water sizing probably should be increased from 1 in. to at least 1 1/4 with hot side added and 100 gal w/h..............ds
PLM16-04193 PLM-Aging Inspection7/16/20187/16/20187/16/2018 8:16:07 AM PASS
no calls