PLM18-02984
| Water Heater Final | 7/16/2018 | 7/16/2018 | 7/16/2018 3:31:10 PM | P | PASS |
|
|
Elvira ###-#### Phone #: ###-#### Inspection requested via web by curtis rowe
|
PLM18-02444
| Final | 7/16/2018 | 7/16/2018 | 7/16/2018 3:14:27 PM | P | PASS |
|
|
After 1:30
|
PLM18-02983
| Water Heater Final | 7/16/2018 | 7/16/2018 | 7/16/2018 2:55:19 PM | P | PASS |
|
|
Space number 46 Ana Torres ###-#### Spanish speaking Phone #: ###-#### Inspection requested via web by curtis rowe
|
PLM18-02978
| Other | 7/15/2018 | 7/16/2018 | 7/16/2018 1:54:49 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by William Thompson. Passed as a water heater final
|
PLM18-02978
| Water Heater Final | 7/16/2018 | 7/16/2018 | 7/16/2018 1:54:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Thompson
|
PLM18-02891
| Water and/or Sewer | 7/16/2018 | 7/16/2018 | 7/16/2018 1:35:30 PM | P | PART |
|
|
LATE PM IF POSSIBLE. WATER SERVICE INSPECTION ONLY Phone #: ###-#### Inspection requested via web by Chris Field. OK to cover. Certify PVB and recall
|
PLM18-02023
| Final | 7/16/2018 | 7/16/2018 | 7/16/2018 1:20:24 PM | P | PART |
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. The backflow assembly in the carwash certification is out of date. Have all backflows certified then recall final. Plumbing under this permit is passed.
|
PLM18-01702
| Plumbing Rough-in | 7/13/2018 | 7/16/2018 | 7/16/2018 11:09:43 AM | A | PASS |
|
|
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. The pvc pipe in the return air plenum has been fire wrapped with an apporved 3M wrap. OK to cover.
|
PLM18-00752
| Plumbing Rough-in | 7/13/2018 | 7/16/2018 | 7/16/2018 11:00:39 AM | A | FAIL |
|
|
ANDY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.. No access to an approved set of plans. The water and waste test pressure are passed to the south half of the bulilding and ok to pull the test. Approved to cover on side of the walls. Call for re-inspection with access to a stamped set of plans.
|
PLM18-02979
| Plumbing Rough-in | 7/16/2018 | 7/16/2018 | 7/16/2018 10:22:59 AM | A | FAIL |
|
|
There will be someone there from other trades working. Please call with any questions. Thank you Troy Phone #: ###-#### Inspection requested via web by Troy Paulin. The kitchen sink is not an island application and must be vented outside. The dwv test failed.
|