ELE16-03912
| Conference | 7/15/2019 | 7/16/2019 | 7/16/2019 2:15:35 PM | P | DONE |
|
|
Please call or text when you are headed over so that I can leave work and meet you there. Thanks! The 208 area code is needed on my number. Phone #: ###-#### Inspection requested via web by Joshua Fusselman Discussed install of tankless water heater that needs 60amp with 50 amp wire installed. Unit to be downsized or wire replaced with appropriate sizing reqired. Owner will contact plumbing insp to insure clearences of unit installed in closet close to combustible material,...
|
ELE19-01930
| Permanent Service | 7/16/2019 | 7/16/2019 | 7/16/2019 1:56:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn p/s u/g n ok
|
ELE19-02537
| Rough-In Permanent Service | 7/15/2019 | 7/16/2019 | 7/16/2019 1:14:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Manu specs for PVC type connector shall be listed for use not a NM cable connector, discussed this with HVC company and will insure listed type connector is used.. Rough-in ok to cover p/s u/g n ok
|
ELE19-01176
| Final | 7/15/2019 | 7/16/2019 | 7/16/2019 11:48:07 AM | A | PASS |
|
|
Lock box code 6360. If you have any questions please feel free to contact Andrew ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Final ok
|
ELE19-01599
| Final | 7/15/2019 | 7/16/2019 | 7/16/2019 11:47:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Angela Stears Correction fixed final for pool ok, No card on site to sign for pool
|
ELE19-02604
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 10:24:10 AM | A | PASS |
|
|
1-20A CIRCUIT, 2 LIGHTS, 2 PLUGS, 1 JUNCTION BOX. Phone #: ###-#### Inspection requested via web by Hidajet Zahic 2 receptacles added in living room area ok to cover. #note receptacle added in basement will need GFCI protection for final as it is a unfinished basement...
|
ELE19-02346
| Electrical Rough-In | 7/15/2019 | 7/16/2019 | 7/16/2019 10:19:37 AM | A | PASS |
|
|
We need a uffer inspection for building 1. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Uffer for building 1 with #4 copper installed ok to cover. Eplan states 2/0 to be installed this is not main switch gear on this building as just a branch feed to openers and lights to be installed
|
ELE19-02328
| Final | 7/15/2019 | 7/16/2019 | 7/16/2019 9:25:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson Final ok
|
ELE19-02327
| Final | 7/15/2019 | 7/16/2019 | 7/16/2019 9:24:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson Final ok
|
ELE19-02619
| Rough-In Permanent Service | 7/15/2019 | 7/16/2019 | 7/16/2019 9:24:31 AM | A | PASS |
|
|
Please contact when done Phone #: ###-#### Inspection requested via web by Thomas wilson U/G ok to cover p/s u/g rec ok
|