Inspections for the day of: Tuesday, July 16, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-03912 Conference7/15/20197/16/20197/16/2019 2:15:35 PMPDONE
Please call or text when you are headed over so that I can leave work and meet you there. Thanks!
The 208 area code is needed on my number. Phone #: ###-#### Inspection requested via web by Joshua Fusselman
Discussed install of tankless water heater that needs 60amp with 50 amp wire installed. Unit to be downsized or wire replaced with appropriate sizing reqired. Owner will contact plumbing insp to insure clearences of unit installed in closet close to combustible material,...
ELE19-01930 Permanent Service7/16/20197/16/20197/16/2019 1:56:12 PMPPASS
Phone #: ###-#### Inspection requested via web by Darryn Coburn
p/s u/g n ok
ELE19-02537 Rough-In Permanent Service7/15/20197/16/20197/16/2019 1:14:00 PMPPASS
Phone #: ###-#### Inspection requested via web by Emmet Bushman
Manu specs for PVC type connector shall be listed for use not a NM cable connector, discussed this with HVC company and will insure listed type connector is used..
Rough-in ok to cover
p/s u/g n ok
ELE19-01176 Final7/15/20197/16/20197/16/2019 11:48:07 AMAPASS
Lock box code 6360. If you have any questions please feel free to contact Andrew ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan
Final ok
ELE19-01599 Final7/15/20197/16/20197/16/2019 11:47:49 AMAPASS
Phone #: ###-#### Inspection requested via web by Angela Stears
Correction fixed final for pool ok, No card on site to sign for pool
ELE19-02604 Electrical Rough-In7/15/20197/16/20197/16/2019 10:24:10 AMAPASS
1-20A CIRCUIT, 2 LIGHTS, 2 PLUGS, 1 JUNCTION BOX. Phone #: ###-#### Inspection requested via web by Hidajet Zahic
2 receptacles added in living room area ok to cover. #note receptacle added in basement will need GFCI protection for final as it is a unfinished basement...
ELE19-02346 Electrical Rough-In7/15/20197/16/20197/16/2019 10:19:37 AMAPASS
We need a uffer inspection for building 1. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins
Uffer for building 1 with #4 copper installed ok to cover. Eplan states 2/0 to be installed this is not main switch gear on this building as just a branch feed to openers and lights to be installed
ELE19-02328 Final7/15/20197/16/20197/16/2019 9:25:04 AMAPASS
Phone #: ###-#### Inspection requested via web by Thomas wilson
Final ok
ELE19-02327 Final7/15/20197/16/20197/16/2019 9:24:47 AMAPASS
Phone #: ###-#### Inspection requested via web by Thomas wilson
Final ok
ELE19-02619 Rough-In Permanent Service7/15/20197/16/20197/16/2019 9:24:31 AMAPASS
Please contact when done Phone #: ###-#### Inspection requested via web by Thomas wilson
U/G ok to cover
p/s u/g rec ok