BLD1053154
| INSP - Final | 7/17/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | | PASS |
|
|
L/C 9845
|
BLD1055316
| INSP - Conference | 7/17/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | | PASS |
|
|
KEEP C/N, NEED ARCH'S DESIGN FOR SHAFT FRAMING AT EXT. WALL
|
BLD1055413
| INSP - Framing/ Rough-in | 7/17/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | | FAIL |
|
|
NEED ENG FOR TALL WALLS
|
BLD1055649
| INSP - Conference | 7/18/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | | PASS |
|
|
FEES PAID, DOC'S REC'D; 25M
|
BLD1055942
| INSP - Carpentry | 7/17/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | | PASS |
|
|
BSMT SLAB AND FRAMING;30M
|
BLD95-00254
| INSP - Carpentry | 7/17/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | | NR |
|
|
NEED DETAIL FOR SHAFT AND 2HR. WALL FIX. 55M.
|
BLD1055420
| INSP - Carpentry | 7/17/1995 | 7/17/1995 | 7/17/1995 12:00:00 AM | P | PASS |
|
|
|