Inspections for the day of: Thursday, July 17, 1997.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE97-02612 INSP - Temporary service7/17/19977/17/19977/17/1997 12:00:00 AM NR
/ / 315 - nr will stop back later jf
ELE97-02350 INSP - Ele Rough-In/Perm Svc7/16/19977/17/19977/17/1997 12:00:00 AMAPASS
07/17/97 315 - 09&53 ok jf 11rms 1a/c 200a u/g new
ELE97-02303 INSP - Conference7/16/19977/17/19977/17/1997 12:00:00 AMAPASS
07/17/97 315 - ARROUND 10 A.M. 01 ok jf talked with Ron of A&B about c before inspection. He had pictures of eall showing 09 everything looked see added 25 inspectuin request
ELE97-01805 INSP - Final7/17/19977/17/19977/17/1997 12:00:00 AMPPASS
07/17/97 315 - 14 ok jf
ELE97-02227 INSP - Conference7/17/19977/17/19977/17/1997 12:00:00 AMPCANC
07/17/97 315 - meet lee at his desk at 1 pm this is for Friday 7/17/97
ELE97-02357 INSP - Electrical Rough-In7/17/19977/17/19977/17/1997 12:00:00 AMPPASS
07/17/97 315 - 4 rooms 09 ok jf res. rem 4rms
ELE97-02359 INSP - T/S and Final7/17/19977/17/19977/17/1997 12:00:00 AMPPASS
07/17/97 315 - 49&14 ok jf u/g new
ELE97-02362 INSP - T/S and Final7/17/19977/17/19977/17/1997 12:00:00 AMPNR
07/17/97 315 - no t/s at address jf
ELE97-02365 INSP - T/S and Final7/17/19977/17/19977/17/1997 12:00:00 AMPPASS
07/17/97 315 - 49&14 ok jf u/g new
ELE97-02394 INSP - Final7/17/19977/17/19977/17/1997 12:00:00 AMPPASS
TRADITIONAL DID ROUGH-IN AND SERVICE. BETTER HOMES FINISHED TRIM OUT FOR FINAL./PAT
ELE97-02336 INSP - Ele Rough-In/Perm Svc7/17/19977/17/19977/16/1997 12:00:00 AMPPASS
09&53 ok jf 10rms 1a/c 200a u/g new
ELE97-02355 INSP - T/S and Final7/17/19977/17/19977/16/1997 12:00:00 AMPPASS
49&14 ok jf u/g new