BLD96-00710
| INSP-Sprinkler Rough-in/Hydro | 7/17/1997 | 7/17/1997 | 7/17/1997 12:00:00 AM | A | FAIL |
|
|
walkthrough of floors 1-6 and penthouse for sprinkler locations and bracing. plans not available, bracing not complete, some obstructions noted, all areas not covered, porte coutre not covered
|
BLD96-01628
| INSP-Sprinkler Rough-in/Hydro | 7/16/1997 | 7/17/1997 | 7/17/1997 12:00:00 AM | A | PART |
|
|
07/16/97 406 - UNDERGROUND FLUSH OK SPKLR ROUGH IN OK TO COVER EXCEPT IN JOIST AREAS.
|
BLD97-00427
| INSP-Final Inspection | 7/16/1997 | 7/17/1997 | 7/17/1997 12:00:00 AM | A | CANC |
|
|
contractor canceled this. set up for friday
|