Inspections for the day of: Monday, July 17, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-02400 Water and/or Sewer7/14/20007/17/20007/17/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/14/2000 at 14:59:18. Contact: ###-####. conference on sewer inspections 7/17/00 9:50:20 AM
PLM99-02531 Final7/14/20007/17/20007/17/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/14/2000 at 15:25:11. Contact: ###-####.
PLM00-02493 Plumbing Rough-in7/14/20007/17/20007/17/2000 12:00:00 AMAPART
quiznos sandwich shop\\###-#### partial gw ok to cover everything except needed repairs to existing below grade waste and roof drainage systems. will leave repair areas open and call for inspection 7/17/00 9:15:28 AM
PLM00-02495 Plumbing Rough-in7/17/20007/17/20007/17/2000 12:00:00 AMPPART
###-#### sewer not tied in in crawl space 7/17/00 10:08:35 AM
PLM00-02498 Water and/or Sewer7/17/20007/17/20007/17/2000 12:00:00 AMPPART
Dan ###-####
PLM00-02503 Water and/or Sewer7/17/20007/17/20007/17/2000 12:00:00 AMPPASS
dennis w/s final ###-####
PLM00-01736 Final7/17/20007/17/20007/17/2000 12:00:00 AMPPASS
CRAIG ###-#### FN
PLM00-02508 Water and/or Sewer7/17/20007/17/20007/17/2000 12:00:00 AMPCANC
WATER & SWR---BRIAN-- ###-####--per brian cancel
PLM00-02508 Water and/or Sewer7/17/20007/17/20007/17/2000 12:00:00 AMPFAIL
WATER & SWR---BRIAN-- ###-#### piping incomplete 7/17/00 2:19:24 PM
PLM00-02493 Groundwork7/17/20007/17/20007/17/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 7/17/00 2241 university gw repair