BLD00-01287
| BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
bryan ###-#### floor will be checked at final--cancel per bryan Ok to insul. 7/18/00 2:00:45 PM
|
BLD00-01388
| BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
JOHN ###-#### FR Elec? ok to insul. pending R/I. 7/18/00 2:08:33 PM
|
BLD00-01081
| BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
###-#### N/R per. cont. recall. 7/18/00 2:00:58 PM
|
BLD00-01696
| BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
scott--###-#### cell fr--call 1st please before insp N/R, recall. 7/18/00 2:01:13 PM
|
BLD00-01456
| BLD-Other | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 15:45:41. Contact: ###-####. Need elec. for clg. & taut pod wires. 7/18/00 2:08:47 PM
|
BLD00-01046
| BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
MIKE-- ###-#### FR
|
BLD00-01615
| BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 16:39:07. Contact: ###-####. Fail- 2nd C/N....conf. w/framer. 7/18/00 2:01:45 PM
|
BLD00-01665
| BLD-Conference | 7/14/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 16:50:42. Contact: ###-####. Called, left msg. no response. 7/18/00 2:01:30 PM
|
BLD00-00775
| BLD-Conference | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | PASS |
|
|
W/Al. H. refound. Req's; need eng's letter (per previous C/N re: compaction.
|
BLD00-00775
| BLD-Conference | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | A | PASS |
|
|
w/alan H. ....need eng's reports prior to pour....keep C/N.
|
BLD00-01510
| BLD-Conference | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PASS |
|
|
w/Bldr. re: mec check.
|
BLD00-01265
| BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | FAIL |
|
|
lorin-- ###-#### shear wall shear: C/N nailing, blocking @ rear tall wall. 7/18/00 2:10:41 PM
|
BLD00-01287
| BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | FAIL |
|
|
bryan-- ###-#### fr insp Keep C/N 7/18/00 2:09:39 PM
|
BLD00-00674
| BLD-Energy code compliance | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | FAIL |
|
|
jed ###-#### Keep C/N, need mec. check, complete corrections. 7/18/00 2:09:20 PM
|
BLD00-01287
| BLD-Energy code compliance | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | FAIL |
|
|
bryan --###-#### energy code Recall w/frame 7/18/00 2:09:47 PM
|
BLD00-00766
| BLD-Conference | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PASS |
|
|
Sean ###-#### RE: ramp. 7/18/00 2:10:49 PM
|
BLD00-00104
| BLD-Final | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PASS |
|
|
###-####-- ammon fn C/C #18755 7/18/00 1:54:02 PM
|
BLD00-00535
| BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PART |
|
|
for the shop out back Duane ###-#### Shop ok 7/18/00 2:09:04 PM
|
BLD00-01940
| BLD-Foundation | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PART |
|
|
jed ###-#### Pending reports for welded members recall for remainder. 7/18/00 2:10:18 PM
|
BLD00-02013
| BLD-Footing | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PART |
|
|
Jerry ###-####
|
BLD00-02010
| BLD-Footing | 7/17/2000 | 7/17/2000 | 7/17/2000 12:00:00 AM | P | PART |
|
|
Jerry ###-####
|