FIR01-00356
| INSP-Sprinkler Rough-in/Hydro | 7/16/2001 | 7/17/2001 | 7/17/2001 12:00:00 AM | A | PART |
|
|
Eric ###-#### hydro on west system okay 7/17/2001 12:05:32 PM
|
FIR01-00382
| INSP-Final Inspection | 7/16/2001 | 7/17/2001 | 7/17/2001 12:00:00 AM | A | PASS |
|
|
###-#### 7/17/2001 1:51:34 PM
|
BLD01-00727
| FIRE-Final Inspection | 7/16/2001 | 7/17/2001 | 7/17/2001 12:00:00 AM | A | PASS |
|
|
FIRE FN CHUCK - ###-####
|
BLD01-00895
| FIRE-Sprinkler Rough-in | 7/17/2001 | 7/17/2001 | 7/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/17/2001 at 10:42:22. Contact: ###-####. contractor to have exit sign repaired by south exit and have corridor cleared of debris for structural inspector 7/17/2001 3:00:38 PM
|
BLD01-00525
| FIRE-Alarm Testing | 7/16/2001 | 7/17/2001 | 7/17/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 11:11:36. Contact: ###-####. CANCEL PER BUCK
|
BLD01-00525
| FIRE-Final Inspection | 7/16/2001 | 7/17/2001 | 7/17/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 11:12:47. Contact: ###-####.--CANCEL PER BUCK/MLS
|