ELE02-01491
| Permanent Service | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | NR |
|
|
harold- ###-#### per ser--off cole 1 bl north of the cole ustick intersection p/s not ready conference ok only 7/17/2002 11:27:44 AM
|
ELE02-01291
| Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 11:15:17. Contact: ###-####. new corrections will be posted will meet with contractor 2:30 pm 07/17/02 7/17/2002 2:52:20 PM
|
ELE02-02127
| Rough-In Permanent Service | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 15:19:33. Contact: ###-####. ok corrections made 7/17/2002 10:18:53 AM
|
ELE02-01775
| Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | NH |
|
|
###-#### no access notice posted called 7/17/2002 11:47:11 AM
|
ELE02-02198
| Electrical Rough-In | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | FAIL |
|
|
r/i ###-#### -marv cor. posted called 314.20 all boxes shall be flush with surface, 210.52(A&B), 310.16 shall not protect #14 with 20 amp protection 7/17/2002 6:12:01 PM
|
ELE02-00182
| Final | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
mark ; Phone #: ###-#### r/i for basement ok 7/17/2002 6:47:56 PM
|
ELE02-02204
| Temporary Service | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
allison ###-#### t/p
t/s o/h new ok 7/17/2002 3:50:54 PM
|
ELE02-02206
| Electrical Rough-In | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
TODD; Phone #: ###-#### 1 rm addition ok 7/17/2002 2:24:06 PM
|
ELE02-01291
| Final | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PART |
|
|
conference with contractor conference ok temp occupancy ok note shall not use X-RAY equipment until correction made and inspection completed 7/17/2002 6:13:52 PM
|
ELE02-00775
| Final | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
final ok 7/17/2002 7:04:56 PM
|