PLM02-02052
| Sprinkler (Final) | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
jim; Phone #: ###-#### final ok with 6" of clearance under dcva and drain rock, talked to jim. 7/17/2002 9:12:29 AM
|
PLM02-00165
| Plumbing Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 13:35:02. Contact: . this was a conference about the gw and it was ok 7/16/2002 1:44:39 PM
|
PLM02-02131
| Water and/or Sewer | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
marty ; Phone #: ###-#### sewer
|
PLM02-02125
| Sprinkler (Final) | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 15:13:01. Contact: . tied in in crawl ok needs testing 7/16/2002 3:29:02 PM
|
PLM02-01211
| Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 15:18:36. Contact: .
|
PLM02-00564
| Final | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 07:08:18. Contact: ###-####. needs a dcva on the fountain make up water inside the front door 7/17/2002 1:54:21 PM
|
PLM02-02121
| Sprinkler (Final) | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PART |
|
|
cameron; Phone #: ###-#### talked to cam about having dcva tested prior to inspection, tie in ok will call when tested 7/17/2002 1:46:07 PM
|
PLM02-02138
| Water and/or Sewer | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | NR |
|
|
swr & water ###-####- greg
|
PLM02-02141
| Water and/or Sewer | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | NR |
|
|
greg ###-####
|
PLM02-02142
| Water and/or Sewer | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
###-#### randy
|
PLM02-02143
| Sprinkler (Final) | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
DOUG; Phone #: ###-####
|
PLM02-00340
| Final | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 10:30:16. Contact: ###-####. pipe insulation incomplete, set all fixtures, turn water on to all fixtures, frp behind janitor sinks, fire water heaters, broken lav in office, set all emergency showers, c.o. plugs and covers,roofing membrane in roof drains, janitor sink strainer 7/17/2002 4:49:28 PM
|
PLM02-02033
| Sprinkler (Final) | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PART |
|
|
kirk; Phone #: ###-####-apt # 129 & 231 -waste underground & r/i gw ok santee in vent upside down 7/17/2002 4:46:30 PM
|