Inspections for the day of: Wednesday, July 17, 2002.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01122 BLD-Final7/15/20027/17/20027/17/2002 12:00:00 AMANR
###-#### Trent \\he was mailed a card saying it was going to expire
BLD01-02135 BLD-Final7/16/20027/17/20027/17/2002 12:00:00 AMAPART
jennifer ROOF; Phone #: ###-#### ...visual only....roof installed, looks ok. No insp made. 7/17/2002 10:31:56 AM
BLD02-01210 BLD-Framing/Rough-in7/16/20027/17/20027/17/2002 12:00:00 AMAFAIL
ceiling grid kirt ###-#### ; addd perimeter wires & seismic struts as needed. 7/17/2002 11:04:32 AM
BLD01-02431 BLD-Conference7/16/20027/17/20027/17/2002 12:00:00 AMAPASS
needs to extend permit\###-####; ok to extend per code. 7/17/2002 9:01:37 AM
BLD01-00531 BLD-Final7/16/20027/17/20027/17/2002 12:00:00 AMAPASS
scott; Phone #: ###-#### rec'd eng's affidavit...ok 7/17/2002 11:36:50 AM
BLD01-00000 BLD-Final7/16/20027/17/20027/17/2002 12:00:00 AMAPASS
scott; Phone #: ###-####
BLD00-03729 BLD-Conference7/17/20027/17/20027/17/2002 12:00:00 AMAPASS
rec'd mti's affidavit re part final...ok
BLD01-01122 BLD-Conference7/17/20027/17/20027/17/2002 12:00:00 AMAPASS
Homeowner, w.i.p... permitee is applying for "finish" permit in near future; ok to continue.
BLD02-01419 BLD-Conference7/17/20027/17/20027/17/2002 12:00:00 AMAPASS
ok to roof...nailing ok
BLD02-00365 BLD-Conference7/17/20027/17/20027/17/2002 12:00:00 AMAPASS
recd mti reports, failures noted
BLD00-03519 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMAPASS
rec'd eng's affidavit..ok
BLD01-000-1 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
scott ###-####...rec'd eng's affidavit, ok 7/17/2002 1:56:13 PM
BLD02-00938 BLD-Framing/Rough-in7/17/20027/17/20027/17/2002 12:00:00 AMPPART
SCOTT; Phone #: ###-#### 1st layer core bd at restroom "shaft" installed, add fire caulk &/or add'l gypsum at pipe penetrations, recall. 7/17/2002 2:10:24 PM
BLD02-00579 BLD-Conference7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
w/ supt re: "shaft" at restrooms...complete gyp install...patch as needed, add sealants at pipes.
MEC01-02228 Conference7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
w/ 350 ...will advise re final
BLD01-00599 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
dave; Phone #: ###-####
BLD01-00607 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
dave; Phone #: ###-####
BLD01-00600 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
dave; Phone #: ###-#### 7/17/2002 2:41:55 PM
BLD01-00601 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
dave; Phone #: ###-####; rails ok per 7/17/2002 3:46:59 PM 408 7/17/2002 3:50:39 PM
BLD01-00609 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
dave; Phone #: ###-####; rails ok per 408 7/17/2002 3:57:25 PM
BLD01-00602 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPPASS
dave; Phone #: ###-#### ok for c/o. 7/17/2002 3:58:12 PM
BLD00-03361 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPNR
wendell; Phone #: ###-####
BLD02-01419 BLD-Framing/Rough-in7/17/20027/17/20027/17/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/17/2002 at 09:34:27. Contact: ###-####. roof, int walls ok...no elec installed. 7/17/2002 2:16:53 PM
BLD01-00234 BLD-Final7/17/20027/17/20027/17/2002 12:00:00 AMPNR
need verify all shell reqs... 7/17/2002 8:21:53 PM
BLD02-00505 BLD-Framing/Rough-in7/16/20027/17/20027/17/2002 12:00:00 AMPNR
mike; Phone #: ###-####, keep c/n. 7/17/2002 3:43:16 PM