BLD02-00972
| BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD02-01181
| BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-01207
| BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | FAIL |
|
|
WAYNE; Phone #: ###-####posted c/n. 7/17/2002 2:03:41 PM
|
BLD02-01028
| BLD-Footing | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 13:34:02. Contact: ###-####.ok first pour of 2, new detail from engineer. 7/17/2002 11:13:27 AM
|
BLD01-02601
| BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 15:47:39. Contact: ###-####.west side grid ceiling ok. 7/17/2002 11:31:00 AM
|
BLD02-00318
| BLD-Framing/Rough-in | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PART |
|
|
still need the steel beam calcs as they have removed 2nd beam as shown to be on plans. also need to complete fire place framing, left a c/n on fire place ,also talked with Tony Young,and framer on site Brian,and home owner. Also note do not cover plumbing wall.7/17/2002 1:11:04 PM 7/17/2002 1:11:27 PM
|
MEC02-01926
| Rough-in | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-01145
| BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | FAIL |
|
|
SHANNON; Phone #: ###-####posted c/n. 7/17/2002 3:35:31 PM
|
BLD02-01209
| BLD-Framing/Rough-in | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 10:51:09. Contact: ###-####.need to complete all of prior c/n. 7/17/2002 3:36:39 PM
|
BLD02-00637
| BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | FAIL |
|
|
sign off sheet is taped to the door; Phone #: ###-####c/n posted. 7/17/2002 3:36:19 PM
|