BLD02-00855
| BLD-Foundation | 7/15/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 16:10:15. Contact: ###-####. Already poured. 7/17/2002 9:23:17 AM
|
BLD02-01099
| BLD-Energy code compliance | 7/15/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
###-####- pete Ok to cover 7/17/2002 11:15:22 AM
|
BLD01-02198
| BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PART |
|
|
chris ###-####-please call before insp C/N--Ok to insulate east side additon only. 7/17/2002 12:06:02 PM
|
BLD01-03056
| BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | FAIL |
|
|
robert 861 7/17/2002 8:49:28 AM C/N--Rim joist needs insulation and seal behind elec. outlet--outside walls. 7/17/2002 10:15:24 AM
|
BLD01-00226
| BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | FAIL |
|
|
###-#### front door unlocked--C/N on site--several items including mech. final needed. 7/17/2002 8:50:12 AM
|
BLD01-01944
| BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | FAIL |
|
|
ALAN; Phone #: ###-#### C/N-Posted in job shack. 7/17/2002 2:33:28 PM
|
BLD02-01525
| BLD-Footing | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PART |
|
|
JERED ; Phone #: ###-#### wip--95% completed. 7/17/2002 3:17:11 PM
|
BLD02-01530
| BLD-Footing | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 10:41:32. Contact: ###-####. wip-25% ready 7/17/2002 4:29:00 PM
|
BLD01-03056
| BLD-Final | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | NR |
|
|
BOB; Phone #: ###-####
|
MEC02-01902
| Rough-in | 7/15/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 07:39:21. Contact: ###-####. Fresh air installed. 7/17/2002 2:54:57 PM
|