BLD02-00567
| FIRE-Sprinkler Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | CANC |
|
|
This inspection done under FIR02-00061 7/17/2002 9:56:11 AM
|
BLD01-02601
| FIRE-Conference | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
sprinkler pipe is OK to cover in breakroom, conference room, east/west corridor and in the large open office. The small offices within the large open office need the hangers corrected 7/17/2002 1:00:32 PM
|
BLD02-00698
| FIRE-Sprinkler Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
sprinkler piping is ok for cover. final inspection still required. No approved plans to be field verified 7/17/2002 11:44:33 AM
|
FIR02-00061
| INSP-Sprinkler Rough-in | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | A | PASS |
|
|
Underground thrust block ok for cover
|
FIR02-00176
| INSP-Final Inspection | 7/17/2002 | 7/17/2002 | 7/17/2002 12:00:00 AM | P | PART |
|
|
temporary signature given for the fire sprinklers. Provide heads in tool, sign on riser room door and signs for the fire extinguishers 7/18/2002 9:06:41 AM
|